[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274064":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274064,860,2,"多选题","抹灰工程的施工控制点包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","空鼓、开裂和烂根",true,{"key":16,"text":17,"correct":18},"B","合页、螺钉、合页槽",false,{"key":20,"text":21,"correct":14},"C","抹灰平整度，阴阳角垂直、方正度",{"key":23,"text":24,"correct":14},"D","踢脚板和水泥墙裙等上口出墙厚度控制",{"key":26,"text":27,"correct":14},"E","接搓，颜色","ACDE","抹灰工程的施工控制点：①空鼓、开裂和烂根。②抹灰面平整度，阴阳角垂直、方正度。③踢脚板和水泥墙裙等上口出墙厚度控制。④接槎，颜色。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]