[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274057":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274057,860,2,"多选题","在建设工程项目施工过程中，因（ ）等，需要通过设计单位明确或确认的，施工方必须以技术核定单的方式向监理工程师提出，报送设计单位核准确认。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工方对施工图纸的某些要求不甚明白",true,{"key":16,"text":17,"correct":14},"B","图纸内部存在某些矛盾",{"key":19,"text":20,"correct":14},"C","工程材料调整与代用",{"key":22,"text":23,"correct":14},"D","改变建筑节点构造、管线位置或走向",{"key":25,"text":26,"correct":27},"E","施工单位人员调整问题",false,"ABCD","在建设工程项目施工过程中，因施工方对施工图纸的某些要求不甚明白，或图纸内部存在某些矛盾，或工程材料调整与代用，改变建筑节点构造、管线位置或走向等，需要通过设计单位明确或确认的，施工方必须以技术核定单的方式向监理工程师提出，报送设计单位核准确认。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]