[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274036":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274036,860,2,"多选题","计量控制开工前要（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","建立和完善施工现场计量管理的规章制度",true,{"key":16,"text":17,"correct":14},"B","明确计量控制责任者和配置必要的计量人员",{"key":19,"text":20,"correct":14},"C","严格按规定对计量器具进行维修和校验",{"key":22,"text":23,"correct":14},"D","统一计量单位，组织量值传递，保证量值统一，从而保证施工过程中计量的准确",{"key":25,"text":26,"correct":27},"E","进行工程项目检查验收的项目划分和编号",false,"ABCD","工过程中的计量，包括施工生产时的投料计量、施工测量、监测计量以及对项目、产品或过程的测试、检验、分析计量等。开工前要建立和完善施工现场计量管理的规章制度；明确计量控制责任者和配置必要的计量人员；严格按规定对计量器具进行维修和校验；统一计量单位，组织量值传递，保证量值统一，从而保证施工过程中计量的准确。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]