[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1274027":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1274027,860,2,"多选题","技术交底应根据工程规模和技术复杂程度不同采取相应的方法，常用的方法包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","分项工程技术交底",false,{"key":16,"text":17,"correct":18},"B","书面交底",true,{"key":20,"text":21,"correct":14},"C","防水工程技术交底",{"key":23,"text":24,"correct":18},"D","口头交底",{"key":26,"text":27,"correct":18},"E","样板交底","BDE","前都必须逐级进行交底，其目的是使管理者的计划和决策意图为实施人员所理解。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]