[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273961":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1273961,860,1,"单选题","空调与采暖系统冷热源设备和辅助设备及其管网系统的安装，哪项为不符合规定（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","冷热源和辅助设备必须进行单机试运转和调试",true,{"key":16,"text":17,"correct":18},"B","各种设备、自控阀门与仪表应按照设计要求安装齐全，不得随意增减或更换",false,{"key":20,"text":21,"correct":18},"C","空调冷热水系统，应能实现设计要求的变流量或定流量运行",{"key":23,"text":24,"correct":18},"D","供热系统应能根据热负荷及室内外温度变化实现设计要求的集中质量调节、量调节或质—量调节相结合的运行","空调与采暖系统冷热源设备和辅助设备及其管网系统的安装，应符合下列规定：1、管道系统的制式，应符合设计要求；2、各种设备、自控阀门与仪表应按照设计要求安装齐全，不得随意增减或更换；3、空调冷热水系统，应能实现设计要求的变流量或定流量运行；4、供热系统应能根据热负荷及室内外温度变化实现设计要求的集中质量调节、量调节或质—量调节相结合的运行。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]