[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273956":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1273956,860,1,"单选题","单位工程完工后，（ ）应自行组织有关人员进行检查评定，并向建设单位提交工程验收报告。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分包单位",false,{"key":16,"text":17,"correct":18},"B","施工单位",true,{"key":20,"text":21,"correct":14},"C","监理单位",{"key":23,"text":24,"correct":14},"D","设计单位","单位工程完工后，施工单位应自行组织有关人员进行检查评定，并向建设单位提交工程验收报告。建设单位收到工程报告后，应由建设单位负责人组织施工、设计、监理等单位负责人进行单位工程验收。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]