[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273952":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1273952,860,1,"单选题","建设过程的最后一环是（ ），是投资转人生产或使用成果的标志。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竣工验收",true,{"key":16,"text":17,"correct":18},"B","生产准备",false,{"key":20,"text":21,"correct":18},"C","建设准备",{"key":23,"text":24,"correct":18},"D","后评价阶段","建设过程的最后一环是竣工验收，是投资转人生产或使用成果的标志，对促进建设项目及时投产、发挥投资效益及总结建设经验都具有重要作用。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]