[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273918":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1273918,860,1,"单选题","工程质量的验收均应在（ ）自行检查评定的基础上进行。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","劳务单位",false,{"key":16,"text":17,"correct":14},"B","分包单位",{"key":19,"text":20,"correct":14},"C","总包单位",{"key":22,"text":23,"correct":24},"D","施工单位",true,"工程质量的验收均应在施工单位自行检查评定的基础上，按施工的顺序进行，施工顺序为检验批→分项工程→分部（子分部）工程→单位（子单位）工程",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]