[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273879":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1273879,860,1,"单选题","项目质量控制应以控制（ ）为基本出发点。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","人的因素",true,{"key":16,"text":17,"correct":18},"B","机械的因素",false,{"key":20,"text":21,"correct":18},"C","环境的因素",{"key":23,"text":24,"correct":18},"D","材料的因素","项目质量控制应以控制人的因素为基本出发点。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]