[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273865":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1273865,860,1,"单选题","某办公楼装修项目施工，地面为有防静电要求的活动地板面层；顶面采用轻钢龙骨安装矿棉板吊顶面层（龙骨可见）；墙面为轻钢龙骨石膏板隔墙涂刷乳胶漆面层；一侧墙面安装有固定壁柜、吊柜等。项目部施工完成后，经自检合格后，报请监理工程师进行根据背景资料，回答下列1~6问题。 下列关于活动地板面层验收允许偏差和检验方法的说法，正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","表面平整度允许偏差为2mm，验收时拉5m通线，配合钢直尺检查",false,{"key":16,"text":17,"correct":14},"B","缝格平直允许偏差为3mm，验收时拉5m通线，配合钢直尺检查",{"key":19,"text":20,"correct":14},"C","接缝高低差允许偏差为0.5mm，验收时用钢尺，配合楔形塞尺检查",{"key":22,"text":23,"correct":24},"D","板块间隙宽度允许偏差为0.3mm，验收时用钢尺检查",true,"关于活动地板面层验收允许偏差和检验方法的说法：板块间隙宽度允许偏差为0.3mm，验收时用钢尺检查。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]