[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273699":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1273699,860,1,"单选题","抹灰施工时，罩面成活后第2d应浇水养护，并至少养护（ ）d。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","3",{"key":19,"text":20,"correct":14},"C","5",{"key":22,"text":23,"correct":24},"D","7",true,"抹灰施工时，罩面成活后第2d应浇水养护，并至少养护7d。抹灰分项工程的施工顺序遵循先外墙后内墙，先顶棚后墙面，先三小间（厨房、卫生间、阳台）后房间的原则进行施工",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]