[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273668":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1273668,860,1,"单选题","下列关于预防外墙涂料饰面起鼓、起皮、脱落的措施错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","涂刷底釉涂料前，对基层缺陷进行修补平整；刷除表面油污、浮灰",false,{"key":16,"text":17,"correct":18},"B","检查基层是否干燥，含水率应小于9%",true,{"key":20,"text":21,"correct":14},"C","外墙过于，施涂前可稍加湿润，然后涂抗碱底漆或封闭底漆",{"key":23,"text":24,"correct":14},"D","当基层表面太光滑时，要适当敲毛，出现小孔、麻点可用108胶水配滑石粉作腻子刮平。","预防外墙涂料饰面起鼓、起皮、脱落的措施：1）涂刷底釉涂料前，对基层缺陷进行修补平整；刷除表面油污、浮灰。2）检查基层是否干燥，含水率应小于10f《；新抹水泥砂浆基面夏季养护7d以上；冬季养护14d以上。现浇混凝土墙面夏季养护10d以上；冬季养护20d以上。基面碱性不宜过大，pH值为10左右。3）外墙过于，施涂前可稍加湿润，然后涂抗碱底漆或封闭底漆。4）当基层表面太光滑时，要适当敲毛，出现小孔、麻点可用108胶水配滑石粉作腻子刮平。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]