[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273636":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1273636,860,1,"单选题","建设工程项目质量的影响因素，主要是指在建设工程项目质量目标策划、决策和实现过程中影响质量形成的各种（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","自然因素和社会因素",false,{"key":16,"text":17,"correct":18},"B","客观因素和主观因素",true,{"key":20,"text":21,"correct":14},"C","人为因素和自然因素",{"key":23,"text":24,"correct":14},"D","不确定因素","建设工程项目质量的影响因素，主要是指在建设工程项目质量目标策划、决策和实现过程中影响质量形成的各种客观因素和主观因素。包括人的因素、技术因素、管理因素、环境因素和社会因素等。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]