[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273628":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1273628,860,1,"单选题","检查口、清扫口的设置：设计有规定时按设计要求设置，设计无规定时，应满足（ ）规定。直线管段上应按设计要求设置清扫口。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","《室内管道支架及吊架》03S402",false,{"key":16,"text":17,"correct":18},"B","《建筑给排水及采暖工程施工质量验收规范》GB50242",true,{"key":20,"text":21,"correct":14},"C","《给水排水管道工程施工及验收规范》GB50268--2008",{"key":23,"text":24,"correct":14},"D","《采暖工程施工质量验收规范》GB50244","检查口、清扫口的设置：设计有规定时按设计要求设置，设计无规定时，应满足《建筑给水排水及采暖工程施工质量验收规范》GB50242规定。直线管段上应按设计要求设置清扫口。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]