[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273614":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1273614,860,1,"单选题","抹灰工程的施工控制点不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","空鼓、开裂和烂根",false,{"key":16,"text":17,"correct":18},"B","铰链、螺钉、铰链槽",true,{"key":20,"text":21,"correct":14},"C","抹灰面平整度.阴阳魚垂直、方正度",{"key":23,"text":24,"correct":14},"D","踢脚板和水泥墙裙等上口出墙厚度控制","1抹灰工程的施工控制点：1）空鼓、开裂和烂根。2）抹灰面平整度，阴阳角垂直、方正度。3）踢脚板和水泥墙裙等上口出墙厚度控制。4）接槎，颜色。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]