[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273597":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1273597,860,1,"单选题","（ ）是项目质量目标、责任和措施分解的必然结果。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","多层次结构",false,{"key":16,"text":17,"correct":18},"B","多单元结构",true,{"key":20,"text":21,"correct":14},"C","整体性结构",{"key":23,"text":24,"correct":14},"D","立体化结构","多单元结构是指在建设工程项目质量控制总体系下，第二层次的质量控制体系及其以下的质量自控或保证体系可能有多个。这就是项目质量目标、责任和措施分解的必然结果。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)专业管理实务 岗位知识","建筑工程",0]