[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-859-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},859,"(装饰质量)基础知识","建筑工程",0,8,50,1312,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,189,201,212,220,228,236,248,260,272,284,296,307,319,331,343,352,364,376,388,397,406,418,430,442,454,466,478,490,502,514,526,538,550,558,570,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1272526,1,"单选题","木材表面基层处理时，木材基层的含水率不得大于（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","5%",false,{"key":24,"text":25,"correct":22},"B","8%",{"key":27,"text":28,"correct":22},"C","10%",{"key":30,"text":31,"correct":32},"D","12%",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1272527,"下列关于民用建筑内门的设置的说法，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"手动开启的大门扇应有制动装置",{"key":24,"text":41,"correct":32},"推拉门应有制动装置",{"key":27,"text":43,"correct":22},"双面弹簧门应在可视高度部分装透明安全玻璃",{"key":30,"text":45,"correct":22},"全玻璃门应选用安全玻璃或采取防护措施，并应设防撞提示标志",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1272528,"配料、截料、刨料时要合理确定加工余量，宽度和厚度的加工余量，一面刨光者留（ ）mm。",[50,52,54,56],{"key":20,"text":51,"correct":22},"1",{"key":24,"text":53,"correct":22},"2",{"key":27,"text":55,"correct":32},"3",{"key":30,"text":57,"correct":22},"5",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1272529,"做阳角护角时，如设计无要求，暗护角每侧宽度不应小于（ ）mm。",[62,64,66,68],{"key":20,"text":63,"correct":22},"10",{"key":24,"text":65,"correct":22},"15",{"key":27,"text":67,"correct":22},"25",{"key":30,"text":69,"correct":32},"50",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1272530,"未经（ ）检查验收合格，不得进行工程隐蔽或下道工序的施工。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工单位",{"key":24,"text":77,"correct":32},"项目监理机构",{"key":27,"text":79,"correct":22},"设计单位",{"key":30,"text":81,"correct":22},"质检机构",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1272531,"混凝土和抹灰表面基层处理时，施涂前应将基体或基层的缺棱掉角处、孔洞用（ ）的水泥砂浆（或聚合物水泥砂浆）修补。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1:1",{"key":24,"text":89,"correct":22},"1:2",{"key":27,"text":91,"correct":32},"1:3",{"key":30,"text":93,"correct":22},"1:4",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1272532,"外墙抹灰施工工艺的流程是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":32},"基层清理→找规矩→做灰饼、冲筋→贴分格条→抹底层灰→抹中层灰→抹面层灰→滴水线（槽）→清理",{"key":24,"text":101,"correct":22},"找规矩→基层清理→做灰饼、冲筋→贴分格条→抹底层灰→抹中层灰→抹面层灰→清理",{"key":27,"text":103,"correct":22},"找规矩→基层清理→做灰饼、冲筋→抹底层灰→抹中层灰→滴水线（槽）→抹面层灰→清理",{"key":30,"text":105,"correct":22},"基层清理→找规矩→做灰饼、冲筋→抹底层灰→抹中层灰→贴分格条→滴水线（槽）→抹面层灰→清理",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1272533,"门窗框的宽度超过（ ）mm时，背面应推凹槽，以防卷曲。",[110,112,114,116],{"key":20,"text":111,"correct":22},"90",{"key":24,"text":113,"correct":22},"100",{"key":27,"text":115,"correct":32},"120",{"key":30,"text":117,"correct":22},"150",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1272534,"木门窗制作的工艺是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":32},"配料、截料、刨料→画线→凿眼→拉肩、开榫→起线→拼装",{"key":24,"text":125,"correct":22},"配料、截料、刨料→凿眼→画线→拉肩、开榫→起线→拼装",{"key":27,"text":127,"correct":22},"配料、截料、刨料→凿眼→画线→起线→拉肩、开榫→拼装",{"key":30,"text":129,"correct":22},"配料、截料、刨料→画线→拉肩、开榫→凿眼→起线→拼装",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1272535,"淋浴间隔断高度不宜低于（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"1.50",{"key":24,"text":137,"correct":32},"2.00",{"key":27,"text":139,"correct":22},"2.50",{"key":30,"text":141,"correct":22},"3.00",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1272536,"住宅公共区域的顶棚装修材料应采用防火等级为（ ）级的材料。",[146,147,149,151],{"key":20,"text":20,"correct":32},{"key":24,"text":148,"correct":22},"B1",{"key":27,"text":150,"correct":22},"B2",{"key":30,"text":152,"correct":22},"B3",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},1272537,"轻钢龙骨吊顶施工工艺流程是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"弹线→主龙骨安装→次龙骨安装→吊杆安装→面板安装（安装灯具）→板缝处理",{"key":24,"text":160,"correct":22},"弹线→吊杆安装→主龙骨安装→次龙骨安装→板缝处理→面板安装（安装灯具）",{"key":27,"text":162,"correct":32},"弹线→吊杆安装→主龙骨安装→次龙骨安装→面板安装（安装灯具）→板缝处理",{"key":30,"text":164,"correct":22},"弹线→主龙骨安装→次龙骨安装→面板安装（安装灯具）→板缝处理→吊杆安装",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},1272538,"塑钢彩板门窗安装工艺流程是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":32},"划线定位→塑钢门窗披水安装→防腐处理→塑钢门窗安装→嵌门窗四缝→门窗扇及玻璃的安装→安装五金配件",{"key":24,"text":172,"correct":22},"划线定位→防腐处理→塑钢门窗披水安装→塑钢门窗安装→嵌门窗四缝→门窗扇及玻璃的安装→安装五金配件",{"key":27,"text":174,"correct":22},"划线定位→防腐处理→塑钢门窗披水安装→塑钢门窗安装→门窗扇及玻璃的安装→嵌门窗四缝→安装五金配件",{"key":30,"text":176,"correct":22},"划线定位→塑钢门窗披水安装→防腐处理→塑钢门窗安装→门窗扇及玻璃的安装→嵌门窗四缝→安装五金配件",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1272539,"铝合金、塑料门窗玻璃放偏或放斜的防治措施错误的是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"安放玻璃前，应清除槽口内的灰浆等杂物，特别是排水孔，不得阻塞",{"key":24,"text":184,"correct":32},"安放玻璃时，认真对中、对正，首先保证一侧间隙不大于2mm",{"key":27,"text":186,"correct":22},"玻璃应随安随固定，以免校正后移位和不安全",{"key":30,"text":188,"correct":22},"加强技术培训和质量管理",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1272540,"试验法是指通过必要的试验手段对质量进行判断的检查方法，主要包括（ ）两种。",[193,195,197,199],{"key":20,"text":194,"correct":32},"理化试验和无损检验",{"key":24,"text":196,"correct":22},"物理实验和质量检测",{"key":27,"text":198,"correct":22},"理化试验和质量检测",{"key":30,"text":200,"correct":22},"物理实验和无损检测",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":30,"analysis":33},1272541,"门窗框及厚度大于（ ）mm的门窗扇应采用双夹榫连接。",[205,207,209,211],{"key":20,"text":206,"correct":22},"20",{"key":24,"text":208,"correct":22},"30",{"key":27,"text":210,"correct":22},"40",{"key":30,"text":69,"correct":32},{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1272542,"住宅标准层公共走道装修地面至顶棚的局部净高不应低于（ ）。",[216,217,218,219],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":32},{"key":27,"text":139,"correct":22},{"key":30,"text":141,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},1272543,"混凝土和抹灰表面基层处理时，施涂溶剂型涂料，基体或基层含水率不得大于（ ）。",[224,225,226,227],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":20,"analysis":33},1272544,"窗扇的开启把手距装修地面高度不宜高于（ ）m。",[232,233,234,235],{"key":20,"text":135,"correct":32},{"key":24,"text":137,"correct":22},{"key":27,"text":139,"correct":22},{"key":30,"text":141,"correct":22},{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1272545,"某工程采用低温热水辐射供暖地面，面层铺设木地板。在低温热水辐射供暖地面填充层施工中，经检测，填充层在混凝土的实际强度等级为C20。混凝土填充层施工中加热管内的水压为0.4MPa，填充层养护过程中，加热管内的水压为0.3MPa.为了抢工期，填充层养护7d后，就进行木地板面层的施工。木地板面层与墙、柱交接处留有16mm的伸缩缝。根据背景资料，回答下列1~6问题。 低温热水辐射供暖地面填充层的豆石混凝土强度等级不宜小于（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"C15",{"key":24,"text":243,"correct":32},"C20",{"key":27,"text":245,"correct":22},"C25",{"key":30,"text":247,"correct":22},"C30",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1272546,"水泥砂浆地面起砂的防治措施中，也可以用纯水泥浆罩面的方法进行修补，其操作顺序是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":32},"清理基层→充分冲洗湿润→铺设纯水泥浆（或撒干水泥面）1～2m→压光2～3遍→养护",{"key":24,"text":255,"correct":22},"清理基层→充分冲洗湿润→铺设纯水泥浆（或撒干水泥面）l～2m→压光1～2遍→养护",{"key":27,"text":257,"correct":22},"清理基层→充分冲洗湿润→压光2～3遍→铺设纯水泥浆（或撒干水泥面）l～2m→养护",{"key":30,"text":259,"correct":22},"清理基层→铺设纯水泥浆（或撒干水泥面）1～2m→压光2～3遍→养护",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":30,"analysis":33},1272547,"卫生间并列小便器的中心距离不应小于（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"0.35",{"key":24,"text":267,"correct":22},"0.45",{"key":27,"text":269,"correct":22},"0.55",{"key":30,"text":271,"correct":32},"0.65",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1272548,"五星级酒店卫生间厕位隔间门宜向（ ）开启，厕位隔间宽度不宜小于（ ）m，深度不宜小于（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":32},"内；0.90；1.55",{"key":24,"text":279,"correct":22},"内；0.70；1.35",{"key":27,"text":281,"correct":22},"外；90；1.55",{"key":30,"text":283,"correct":22},"外；0.70；1.35",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1272549,"对待不同的检测对象，应当采集具有（ ）的质量数据。",[288,290,292,294],{"key":20,"text":289,"correct":22},"普遍性",{"key":24,"text":291,"correct":32},"控制意义",{"key":27,"text":293,"correct":22},"特殊性",{"key":30,"text":295,"correct":22},"研究意义",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":30,"analysis":33},1272550,"总体是工作对象的全体，如果要对某种产品进行检测，则总体就是这批产品的全部，它应当是物的集合，通常记作（ ）。",[300,301,303,305],{"key":20,"text":20,"correct":22},{"key":24,"text":302,"correct":22},"N",{"key":27,"text":304,"correct":22},"Q",{"key":30,"text":306,"correct":32},"X",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":20,"analysis":33},1272551,"对总体中的全部个体进行逐个检测，并对所获取的数据进行统计和分析，进而获得质量评价结论的方法通常称为（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":32},"全数检验",{"key":24,"text":314,"correct":22},"完全随机抽样",{"key":27,"text":316,"correct":22},"等距抽样",{"key":30,"text":318,"correct":22},"整群抽样",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":30,"analysis":33},1272552,"某项目走廊进行地面砖面层的铺贴施工，走廊长度为9mx1.8m全部采用600mm×600m瓷质砖，采用15~20mm厚1:2干硬性砂浆结合层，上面涂刮5mm厚的水泥胶粘料，按模数化铺贴。监理方进行检查后发现该走廊有5块瓷砖出现空鼓，要求项目部进行整改。根据背景资料，回答下列1~6问题。 下列关于该走廊验收是否合格的说法，正确的是（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"该走廊瓷砖空鼓率小于规范规定的空鼓率，验收结论合格",{"key":24,"text":326,"correct":22},"该走廊瓷砖空鼓率大于规范规定的空鼓率，验收结论合格",{"key":27,"text":328,"correct":22},"该走廊瓷砖空鼓率小于规范规定的空鼓率，验收结论不合格",{"key":30,"text":330,"correct":32},"该走廊瓷砖空鼓率大于规范规定的空鼓率，验收结论不合格",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},1272553,"在简单随机抽样中，某一个个体被抽到的可能性（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"与第几次抽样有关，第一次抽到的可能性最大",{"key":24,"text":338,"correct":22},"与第几次抽样有关，第一次抽到的可能性最小",{"key":27,"text":340,"correct":32},"与第几次抽样无关，每一次抽到的可能性相等",{"key":30,"text":342,"correct":22},"与第几次抽样无关，与样本容量无关",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},1272554,"某项目走廊进行地面砖面层的铺贴施工，走廊长度为9mx1.8m全部采用600mm×600m瓷质砖，采用15~20mm厚1:2干硬性砂浆结合层，上面涂刮5mm厚的水泥胶粘料，按模数化铺贴。监理方进行检查后发现该走廊有5块瓷砖出现空鼓，要求项目部进行整改。根据背景资料，回答下列1~6问题。 地面砖面层验收时，允许单块砖边角有局部空鼓，但每自然间或标准间的空鼓砖不应超过总数的（ ）％。",[347,348,349,351],{"key":20,"text":55,"correct":22},{"key":24,"text":57,"correct":32},{"key":27,"text":350,"correct":22},"8",{"key":30,"text":63,"correct":22},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1272555,"当工序进行处于稳定状态时，数据直方图会呈现（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":32},"正常型",{"key":24,"text":359,"correct":22},"孤岛型",{"key":27,"text":361,"correct":22},"双峰型",{"key":30,"text":363,"correct":22},"偏向性",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1272556,"抽样的方法通常是利用数理统计的（ ）随机抽取样本。",[368,370,372,374],{"key":20,"text":369,"correct":22},"总体数量",{"key":24,"text":371,"correct":22},"样本数量",{"key":27,"text":373,"correct":32},"基本原理",{"key":30,"text":375,"correct":22},"统计量",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},1272557,"某项目走廊进行地面砖面层的铺贴施工，走廊长度为9mx1.8m全部采用600mm×600m瓷质砖，采用15~20mm厚1:2干硬性砂浆结合层，上面涂刮5mm厚的水泥胶粘料，按模数化铺贴。监理方进行检查后发现该走廊有5块瓷砖出现空鼓，要求项目部进行整改。根据背景资料，回答下列1~6问题。 根据题意，该走廊地面砖面层验收时，应按（ ）自然间进行验收。",[380,382,384,386],{"key":20,"text":381,"correct":22},"0个",{"key":24,"text":383,"correct":32},"1个",{"key":27,"text":385,"correct":22},"2个",{"key":30,"text":387,"correct":22},"3个",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},1272558,"把总体按照研究目的的某些特性分组，然后在每一组中随机抽取样品组成样本的方法叫作（ ）。",[392,394,395,396],{"key":20,"text":393,"correct":32},"分层抽样",{"key":24,"text":314,"correct":22},{"key":27,"text":316,"correct":22},{"key":30,"text":318,"correct":22},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},1272559,"当数据不真实，被人为的剔除，数据直方图会呈现（ ）。",[401,402,404,405],{"key":20,"text":357,"correct":22},{"key":24,"text":403,"correct":32},"陡壁型",{"key":27,"text":361,"correct":22},{"key":30,"text":363,"correct":22},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1272560,"在排列图法分析中，排列图上通常把曲线的累计百分数分为三级，与此相对应的因素分三类。其中A类因素对应（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":32},"频率0％~80％，是影响产品质量的主要因素",{"key":24,"text":413,"correct":22},"频率80％~90%，是影响产品质量的主要因素",{"key":27,"text":415,"correct":22},"频率90％~100％，是影响产品质量的一般因素",{"key":30,"text":417,"correct":22},"频率0％~80%，是影响产品质量的一般因素",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1272561,"全数检验最大的优势是质量数据（ ），可以获取可靠的评价结论。",[422,424,426,428],{"key":20,"text":423,"correct":32},"全面、丰富",{"key":24,"text":425,"correct":22},"完善、具体",{"key":27,"text":427,"correct":22},"深度、广博",{"key":30,"text":429,"correct":22},"浅显、易懂",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1272562,"下列措施中，不属于施工准备阶段的安全技术措施的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"技术准备",{"key":24,"text":437,"correct":22},"物资准备",{"key":27,"text":439,"correct":32},"资金准备",{"key":30,"text":441,"correct":22},"施工队伍准备",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1272563,"下列选项中关于施工项目管理的特点说法有误的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"对象是施工项目",{"key":24,"text":449,"correct":32},"主体是建设单位",{"key":27,"text":451,"correct":22},"内容是按阶段变化的",{"key":30,"text":453,"correct":22},"要求强化组织协调工作",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1272564,"下列选项中，不属于施工项目管理组织的主要形式的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"工作队式",{"key":24,"text":461,"correct":32},"线性结构式",{"key":27,"text":463,"correct":22},"矩阵制式",{"key":30,"text":465,"correct":22},"事业部制式",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},1272565,"下列措施中，不属于施工项目安全控制的措施的是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"组织措施",{"key":24,"text":473,"correct":22},"技术措施",{"key":27,"text":475,"correct":32},"管理措施",{"key":30,"text":477,"correct":22},"制度措施",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},1272566,"下列施工项目管理程序的排序正确的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":32},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":24,"text":485,"correct":22},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":27,"text":487,"correct":22},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":30,"text":489,"correct":22},"投标、签订合同→施工准备→施工→验收交工→用后服务与结算",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},1272567,"下列关于施工项目管理组织的形式的说法中，错误的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"工作队式项目组织适用于大型项目，工期要求紧，要求多工种、多部门配合的项目",{"key":24,"text":497,"correct":22},"事业部式适用于大型经营型企业的工程承包",{"key":27,"text":499,"correct":32},"部门控制式项目组织一般适用于专业性强的大中型项目",{"key":30,"text":501,"correct":22},"矩阵制项目组织适用于同时承担多个需要进行项目管理工程的企业",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1272568,"下列性质中，不属于项目经理部的性质的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":32},"法律强制性",{"key":24,"text":509,"correct":22},"相对独立性",{"key":27,"text":511,"correct":22},"综合性",{"key":30,"text":513,"correct":22},"临时性",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":30,"analysis":33},1272569,"以下关于施工项目经理部综合性的描述，错误的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"施工项目经理部是企业所属的经济组织，主要职责是管理施工项目的各种经济活动",{"key":24,"text":521,"correct":22},"施工项目经理部的管理职能是综合的，包括计划、组织、控制、协调、指挥等多方面",{"key":27,"text":523,"correct":22},"施工项目经理部的管理业务是综合的，从横向看包括人、财、物、生产和经营活动，从纵向看包括施工项目寿命周期的主要过程",{"key":30,"text":525,"correct":32},"施工项目经理部受企业多个职能部门的领导",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},1272570,"以下不属于施工项目管理内容的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"施工项目的生产要素管理",{"key":24,"text":533,"correct":22},"施工项目的合同管理",{"key":27,"text":535,"correct":22},"施工项目的信息管理",{"key":30,"text":537,"correct":32},"单体建筑的设计",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1272571,"施工项目控制的任务是进行以项目进度控制、质量控制、成本控制和安全控制为主要内容的四大目标控制。其中下列不属于与施工项目成果相关的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"进度控制",{"key":24,"text":545,"correct":32},"安全控制",{"key":27,"text":547,"correct":22},"质量控制",{"key":30,"text":549,"correct":22},"成本控制",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},1272572,"下列选项中关于施工项目管理的特点说法错误的是（ ）。",[554,555,556,557],{"key":20,"text":447,"correct":22},{"key":24,"text":449,"correct":32},{"key":27,"text":451,"correct":22},{"key":30,"text":453,"correct":22},{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":27,"analysis":33},1272573,"下列各项措施中，不属于施工项目质量控制的措施的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"提高管理、施工及操作人员自身素质",{"key":24,"text":565,"correct":22},"提高施工的质量管理水平",{"key":27,"text":567,"correct":32},"尽可能采用先进的施工技术、方法和新材料、新工艺、新技术，保证进度目标实现",{"key":30,"text":569,"correct":22},"加强施工项目的过程控制",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":20,"analysis":33},1272574,"施工项目过程控制中，加强专项检查，包括自检、（ ）、互检。",[574,576,578,580],{"key":20,"text":575,"correct":32},"专检",{"key":24,"text":577,"correct":22},"全检",{"key":27,"text":579,"correct":22},"交接检",{"key":30,"text":581,"correct":22},"质检",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":30,"analysis":33},1272575,"施工项目的劳动组织不包括下列的（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"劳务输入",{"key":24,"text":589,"correct":22},"劳动力组织",{"key":27,"text":591,"correct":22},"项目经理部对劳务队伍的管理",{"key":30,"text":593,"correct":32},"劳务输出",[595,598,601,604,607,610],{"id":15,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":15},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]