[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273417":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1273417,859,3,"判断题","建设项目管理的对象是施工项目。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"施工项目管理的对象是施工项目。施工项目管理周期包括工程投标、签订施工合同、施工准备、施工、竣工验收、保修等。施工项目有多样性、固定性和体型庞大等特点，因此施工项目管理具有先有交易活动，后有“生产成品”，生产活动和交易活动很难分开等特殊性。",{"id":6,"name":21,"category":22,"favorite":23},"(装饰质量)基础知识","建筑工程",0]