[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273228":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1273228,859,3,"判断题","在装饰施工中，移交基准点（线）时，不需要书面手续。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"在业主方、监理共同见证下，总承包方或者业主管理方到现场提供书面水平基准标高点和首层基准点控制图。施工员及放线技术员，并对基准点、线及原始标高进行复核。结合幕墙设计图、建筑结构图进行确认，经检查确认后，填写轴线、控制线记录表，请业主、监理及总承包方负责人签字确认。做好现场交接的影像资料记录并存档。",{"id":6,"name":21,"category":22,"favorite":23},"(装饰质量)基础知识","建筑工程",0]