[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1273195":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1273195,859,3,"判断题","在装饰施工中，根据施工进度的计划，合理安排测量放线工作，穿插进行。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(装饰质量)基础知识","建筑工程",0]