[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272868":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1272868,859,2,"多选题","在开展测量放线工作时，哪些是需要首先应确定的线（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","主控线",true,{"key":16,"text":17,"correct":14},"B","轴线",{"key":19,"text":20,"correct":21},"C","1m线",false,{"key":23,"text":24,"correct":21},"D","地面完成面线",{"key":26,"text":27,"correct":14},"E","±0.000线","ABE","在开展测量放线工作时，主控线、轴线、±0.000线应首先确定。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)基础知识","建筑工程",0]