[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272841":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1272841,859,2,"多选题","观测周期和观测时间应根据（ ）的变化情况而定。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工程的性质",true,{"key":16,"text":17,"correct":14},"B","施工进度",{"key":19,"text":20,"correct":14},"C","地基基础",{"key":22,"text":23,"correct":14},"D","基础荷载",{"key":25,"text":26,"correct":27},"E","地基变形特征",false,"ABCD","观测周期和观测时间应根据工程的性质、施工进度、地基基础、基础荷载的变化情况而定。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)基础知识","建筑工程",0]