[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272840":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1272840,859,2,"多选题","在局部区域空间放线时，首先应完成（ ）放线工作。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","顶面完成面线",true,{"key":16,"text":17,"correct":14},"B","墙面完成面线",{"key":19,"text":20,"correct":14},"C","门窗完成面线",{"key":22,"text":23,"correct":24},"D","地面基层面线",false,{"key":26,"text":27,"correct":14},"E","门窗洞中线","ABCE","在局部区域空间放线时，首先应完成顶面完成面线、墙面完成面、门窗洞中线放线工作。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰质量)基础知识","建筑工程",0]