[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272708":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":24},1272708,859,1,"单选题","下述关于施工许可证的办理时间及办理单位说法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","开工前、施工单位",false,{"key":16,"text":17,"correct":18},"B","开工前、建设单位",true,{"key":20,"text":21,"correct":14},"C","开工后、施工单位",{"key":23,"text":21,"correct":14},"D","施工许可证的办理时间：开工前；办理单位：建设单位。",{"id":6,"name":26,"category":27,"favorite":28},"(装饰质量)基础知识","建筑工程",0]