[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272607":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1272607,859,1,"单选题","下列不属于竣工结算编制的依据有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工承包合同及补充协议",false,{"key":16,"text":17,"correct":14},"B","设计施工图及竣工图",{"key":19,"text":20,"correct":14},"C","现场签证记录",{"key":22,"text":23,"correct":24},"D","未确定的甲方口头指令",true,"竣工结算编制的依据有①施工承包合同及补充协议②设计施工图及竣工图③现场签证记录。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)基础知识","建筑工程",0]