[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272605":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1272605,859,1,"单选题","以下属于影响工期因素中管理因素的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","复杂的工程地质条件",false,{"key":16,"text":17,"correct":14},"B","地下埋藏文物的保护、处理",{"key":19,"text":20,"correct":21},"C","安全伤亡事故",true,{"key":23,"text":24,"correct":14},"D","洪水、地震、台风等不可抗力","管理因素：业主、施工单位自身的计划管理问题，没有一个很好的计划，工程管理推着干、出现安全伤亡事故、出现重大质量事故、特种设备到使用前才想起来采购",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)基础知识","建筑工程",0]