[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272370":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1272370,859,1,"单选题","在测量放线前，根据设计图纸，主要由（ ）负责建筑空间数据采集。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":18},"B","施工员",true,{"key":20,"text":21,"correct":14},"C","深化设计",{"key":23,"text":24,"correct":14},"D","辅助放线员","在测量放线前，根据设计图纸，主要由施工员负责建筑空间数据采集。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)基础知识","建筑工程",0]