[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272350":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1272350,859,1,"单选题","对由横梁与竖框组成的幕墙，幕墙施工放线的一般原则是：（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","一般先弹出竖框的锚固点，然后确定竖框的位置。待横梁弹到竖框上，方可进行竖框通长布置",false,{"key":16,"text":17,"correct":14},"B","一般先弹出竖框的位置，然后确定竖框的锚固点。待横梁弹到竖框上，方可进行竖框通长布置",{"key":19,"text":20,"correct":14},"C","一般先弹出竖框的锚固点，然后确定竖框的位置。待竖框通长布置完毕，横梁再弹到竖框上",{"key":22,"text":23,"correct":24},"D","一般先弹出竖框的位置，然后确定竖框的锚固点。待竖框通长布置完毕，横梁再弹到竖框上",true,"放线的原则是：对由横梁与竖框组成的幕墙，一般先弹出竖框的位置，然后确定竖框的锚固点。待竖框通长布置完毕，横梁再弹到竖框上。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰质量)基础知识","建筑工程",0]