[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-858-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":460},{"id":5,"name":6,"category":7,"favorite":8},858,"(土建质量)专业管理实务 岗位知识","建筑工程",0,4,50,1473,[13,34,46,58,70,82,94,106,116,128,138,150,162,174,184,194,206,215,223,235,247,259,270,279,291,300,308,318,328,334,340,346,352,358,364,370,376,382,388,394,400,406,412,418,424,430,436,442,448,454],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1270843,1,"单选题","砂桩地基的灌砂量符合要求，其实际用砂量与计算体积必须≥（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","100％",true,{"key":24,"text":25,"correct":26},"B","95％",false,{"key":28,"text":29,"correct":26},"C","90％",{"key":31,"text":32,"correct":26},"D","85％","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1270844,"工程竣工验收时，沉降（ ）达到稳定标准的，沉降观测应继续进行。",[38,40,42,44],{"key":20,"text":39,"correct":22},"没有",{"key":24,"text":41,"correct":26},"已经",{"key":28,"text":43,"correct":26},"120％",{"key":31,"text":45,"correct":26},"150％",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1270845,"混凝土留置试块时，每组为（ ）块。",[50,52,54,56],{"key":20,"text":51,"correct":22},"3",{"key":24,"text":53,"correct":26},"4",{"key":28,"text":55,"correct":26},"5",{"key":31,"text":57,"correct":26},"6",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1270846,"防水混凝土（ ）进行养护。",[62,64,66,68],{"key":20,"text":63,"correct":26},"不宜",{"key":24,"text":65,"correct":22},"应",{"key":28,"text":67,"correct":26},"最好",{"key":31,"text":69,"correct":26},"不必",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1270847,"灌注桩桩顶标高至少要比设计标高高出（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"0.5m",{"key":24,"text":77,"correct":26},"0.6m",{"key":28,"text":79,"correct":26},"0.7m",{"key":31,"text":81,"correct":26},"0.8m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1270848,"某高层商业建筑位于闹市区，周边建筑物较多，地质条件复杂，地下水位较高设计采用泥浆护壁成孔灌注桩，共110根，桩径1.2m,水下C30混凝土，均为端承桩。情形1：某根灌注桩长27m，钢筋笼分段加工吊放，受力钢筋（Ф25）搭接连接采用双面电弧焊，钢筋笼内侧对称安装超声波检测管。情形2：有5根桩的混凝土标准养护试块强度不合格，经对桩体钻芯取样检测，桩体混凝土实际强度均满足要求。 情形1中，按规定应至少安装3根超声波检测管，超声波检测管埋设数量通常是以桩的（ ）来确定的。",[86,88,90,92],{"key":20,"text":87,"correct":26},"深度",{"key":24,"text":89,"correct":22},"直径",{"key":28,"text":91,"correct":26},"桩数",{"key":31,"text":93,"correct":26},"混凝土等级",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1270849,"桩身质量检验，对直径大于800mm的混凝土嵌岩桩应采用（ ）法检测。",[98,100,102,104],{"key":20,"text":99,"correct":26},"静载荷",{"key":24,"text":101,"correct":26},"基岩试验",{"key":28,"text":103,"correct":22},"钻孔抽芯法",{"key":31,"text":105,"correct":26},"低应变动测法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1270850,"混凝土预制桩采用电焊接头时，电焊结束后停歇时间应大于（ ）min。",[110,112,114,115],{"key":20,"text":111,"correct":22},"1",{"key":24,"text":113,"correct":26},"2",{"key":28,"text":51,"correct":26},{"key":31,"text":53,"correct":26},{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1270851,"摩擦桩孔底沉渣厚度应≤（ ）mm。",[120,122,124,126],{"key":20,"text":121,"correct":26},"100",{"key":24,"text":123,"correct":22},"150",{"key":28,"text":125,"correct":26},"200",{"key":31,"text":127,"correct":26},"300",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1270852,"采用硫黄胶泥接桩，应每（ ）kg做一组试件。",[132,134,135,136],{"key":20,"text":133,"correct":26},"50",{"key":24,"text":121,"correct":22},{"key":28,"text":125,"correct":26},{"key":31,"text":137,"correct":26},"500",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},1270853,"桩基工程应由（ ）组织验收。",[142,144,146,148],{"key":20,"text":143,"correct":22},"总监理工程师或建设单位项目负责人",{"key":24,"text":145,"correct":26},"施工单位项目负责人",{"key":28,"text":147,"correct":26},"质监站人员",{"key":31,"text":149,"correct":26},"质量员",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},1270854,"砂及砂石地基的主控项目有（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"地基承载力",{"key":24,"text":157,"correct":26},"石料粒径",{"key":28,"text":159,"correct":26},"含水量",{"key":31,"text":161,"correct":26},"分层厚度",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},1270855,"人工挖孔桩应逐孔进行终孔验收，终孔验收的重点是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":26},"挖孔的深度",{"key":24,"text":169,"correct":26},"孔底的形状",{"key":28,"text":171,"correct":22},"持力层的岩土特征",{"key":31,"text":173,"correct":26},"沉渣厚度",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},1270856,"主控项目必须（ ）符合验收标准规定。",[178,180,182,183],{"key":20,"text":179,"correct":26},"80％及以上",{"key":24,"text":181,"correct":26},"90％及以上",{"key":28,"text":25,"correct":26},{"key":31,"text":21,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},1270857,"桩顶嵌人承台内的长度不宜小于（ ）cm。",[188,189,190,192],{"key":20,"text":113,"correct":26},{"key":24,"text":55,"correct":22},{"key":28,"text":191,"correct":26},"20",{"key":31,"text":193,"correct":26},"30",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":28,"analysis":33},1270858,"后浇带应在其两侧混凝土龄期达到（ ）d后再施工。",[198,200,202,204],{"key":20,"text":199,"correct":26},"14",{"key":24,"text":201,"correct":26},"28",{"key":28,"text":203,"correct":22},"40",{"key":31,"text":205,"correct":26},"56",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":24,"analysis":33},1270860,"承台纵向钢筋的混凝土保护层厚度，当有混凝土垫层时，不应小于（ ）mm。",[210,211,212,213],{"key":20,"text":191,"correct":26},{"key":24,"text":203,"correct":22},{"key":28,"text":133,"correct":26},{"key":31,"text":214,"correct":26},"70",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":28,"analysis":33},1270861,"水泥土搅拌桩复合地基承载力检验数量为总数的0.5％-1%，但不应少于（ ）处。",[219,220,221,222],{"key":20,"text":111,"correct":26},{"key":24,"text":113,"correct":26},{"key":28,"text":51,"correct":22},{"key":31,"text":53,"correct":26},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},1270862,"灰土采用体积配合比，一般宜为（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"4：6",{"key":24,"text":230,"correct":26},"2：8",{"key":28,"text":232,"correct":26},"3：7",{"key":31,"text":234,"correct":22},"B或C",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},1270863,"预制桩桩位垂直于基础梁中心线的允许偏差为（ ）mm。注：H为施工现场地面标高与桩顶设计标高的距离。",[239,241,243,245],{"key":20,"text":240,"correct":26},"100+0.1H",{"key":24,"text":242,"correct":26},"150+0.1H",{"key":28,"text":244,"correct":22},"100+0.01H",{"key":31,"text":246,"correct":26},"150+0.01H",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1270864,"对桩基进行检测时，小应变方法可检测桩的（ ）或声波透射法检测。",[251,253,255,257],{"key":20,"text":252,"correct":26},"承载力",{"key":24,"text":254,"correct":22},"桩身质量",{"key":28,"text":256,"correct":26},"承载力和桩身质量",{"key":31,"text":258,"correct":26},"桩混凝土强度",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1270865,"（ ）是先张法预应力管桩验收的主控项目。",[263,264,266,268],{"key":20,"text":252,"correct":22},{"key":24,"text":265,"correct":26},"外观质量",{"key":28,"text":267,"correct":26},"桩顶标高",{"key":31,"text":269,"correct":26},"垂直度",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},1270866,"扩底灌注桩的扩底直径，不应大于桩身直径的（ ）倍。",[274,275,277,278],{"key":20,"text":111,"correct":26},{"key":24,"text":276,"correct":26},"1．5",{"key":28,"text":113,"correct":26},{"key":31,"text":51,"correct":22},{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":28,"analysis":33},1270867,"砂石地基用汽车运输黄砂到现场的，以（ ）为一个验收批。",[283,285,287,289],{"key":20,"text":284,"correct":26},"200m3或300t",{"key":24,"text":286,"correct":26},"300m3或450t",{"key":28,"text":288,"correct":22},"400m3或600t",{"key":31,"text":290,"correct":26},"500m3或800t",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":24,"analysis":33},1270868,"端承桩的孔底沉渣厚度应",[295,297,298,299],{"key":20,"text":296,"correct":26},"10",{"key":24,"text":133,"correct":22},{"key":28,"text":121,"correct":26},{"key":31,"text":125,"correct":26},{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":28,"analysis":33},1270869,"对灰土地基，强夯地基，其竣工后的地基强度或承载力检验数量，每单位工程不应少于（ ）点，每一独立基础下至少应有1点。",[304,305,306,307],{"key":20,"text":111,"correct":26},{"key":24,"text":113,"correct":26},{"key":28,"text":51,"correct":22},{"key":31,"text":53,"correct":26},{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1270870,"水泥土搅拌桩作承重工程桩用时，应取（ ）天后的试件进行强度检验。",[312,314,315,316],{"key":20,"text":313,"correct":22},"90",{"key":24,"text":201,"correct":26},{"key":28,"text":193,"correct":26},{"key":31,"text":317,"correct":26},"60",{"id":319,"libraryId":5,"type":320,"typeLabel":321,"stem":322,"options":323,"answer":325,"analysis":33},1270871,3,"判断题","当桩顶设计标高低于施工现场标高时，对打人桩可在每根桩桩顶沉至场地标高时，可进行中间验收。（ ）",[324,326],{"key":20,"text":325,"correct":22},"正确",{"key":24,"text":327,"correct":26},"错误",{"id":329,"libraryId":5,"type":320,"typeLabel":321,"stem":330,"options":331,"answer":327,"analysis":33},1270872,"在承台及地下室周围的回填中，可不必满足填土密实度要求。（ ）",[332,333],{"key":20,"text":325,"correct":26},{"key":24,"text":327,"correct":22},{"id":335,"libraryId":5,"type":320,"typeLabel":321,"stem":336,"options":337,"answer":327,"analysis":33},1270873,"地基施工结束后，就可立即进行有关检测和质量验收。（ ）",[338,339],{"key":20,"text":325,"correct":26},{"key":24,"text":327,"correct":22},{"id":341,"libraryId":5,"type":320,"typeLabel":321,"stem":342,"options":343,"answer":325,"analysis":33},1270874,"砂桩地基的主控项目为灌砂量，地基强度和地基承载力。（ ）",[344,345],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":347,"libraryId":5,"type":320,"typeLabel":321,"stem":348,"options":349,"answer":325,"analysis":33},1270875,"经计算不需配筋的灌注桩，其桩身可按构造配筋。（ ）",[350,351],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":353,"libraryId":5,"type":320,"typeLabel":321,"stem":354,"options":355,"answer":325,"analysis":33},1270876,"对支护水泥土搅拌桩应取28天后的试件进行强度检验。（ ）",[356,357],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":359,"libraryId":5,"type":320,"typeLabel":321,"stem":360,"options":361,"answer":327,"analysis":33},1270877,"人工挖孔桩的桩位偏差不是其主控项目。（ ）",[362,363],{"key":20,"text":325,"correct":26},{"key":24,"text":327,"correct":22},{"id":365,"libraryId":5,"type":320,"typeLabel":321,"stem":366,"options":367,"answer":325,"analysis":33},1270878,"桩基施工前，成桩机械必须鉴定合格，方可正常使用。（ ）",[368,369],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":371,"libraryId":5,"type":320,"typeLabel":321,"stem":372,"options":373,"answer":325,"analysis":33},1270879,"地下室渗水的检测方法有两种：①用手触摸可感觉到水分浸润，手上会沾有水分②用吸墨纸或报纸贴附，纸会浸润变色。（ ）",[374,375],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":377,"libraryId":5,"type":320,"typeLabel":321,"stem":378,"options":379,"answer":325,"analysis":33},1270880,"防水混凝土中使用粉煤灰的级别不应低于二级，掺量不宜大于20％。（ ）",[380,381],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":383,"libraryId":5,"type":320,"typeLabel":321,"stem":384,"options":385,"answer":325,"analysis":33},1270881,"地下防水工程中当发现水泥砂浆防水层空鼓时应返工重做，可局部返工。（ ）",[386,387],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":389,"libraryId":5,"type":320,"typeLabel":321,"stem":390,"options":391,"answer":325,"analysis":33},1270882,"水泥土搅拌法适用于处理淤泥、淤泥质土、粉土和含水量较高且地基承载力标准值不大于120kPa的黏土地基。（ ）",[392,393],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":395,"libraryId":5,"type":320,"typeLabel":321,"stem":396,"options":397,"answer":325,"analysis":33},1270883,"注浆地基施工结束后15天可进行浆体强度、承载力检验。（ ）",[398,399],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":401,"libraryId":5,"type":320,"typeLabel":321,"stem":402,"options":403,"answer":325,"analysis":33},1270884,"当开挖基槽发现土质、土层结构与勘察资料不符时应进行专门的施工勘察。（ ）",[404,405],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":407,"libraryId":5,"type":320,"typeLabel":321,"stem":408,"options":409,"answer":325,"analysis":33},1270885,"对有密度要求的填方，在夯实或压实之后，要对每层回填土的质量进行检验。（ ）",[410,411],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":413,"libraryId":5,"type":320,"typeLabel":321,"stem":414,"options":415,"answer":327,"analysis":33},1270886,"灌注桩的沉渣厚度以放钢筋笼前所测沉渣为最终值。（ ）",[416,417],{"key":20,"text":325,"correct":26},{"key":24,"text":327,"correct":22},{"id":419,"libraryId":5,"type":320,"typeLabel":321,"stem":420,"options":421,"answer":325,"analysis":33},1270887,"基础工程中持力层为砾石层或卵石层，厚度符合设计要求时，可不进行轻型静力触探。（ ）",[422,423],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":425,"libraryId":5,"type":320,"typeLabel":321,"stem":426,"options":427,"answer":325,"analysis":33},1270888,"水泥土搅拌桩应在成桩后7d内用轻便触探器对桩体进行检测，数量不少于成桩数的2％。（ ）",[428,429],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":431,"libraryId":5,"type":320,"typeLabel":321,"stem":432,"options":433,"answer":325,"analysis":33},1270889,"选用龄期为3个月时间的强度作为水泥土的标准强度。（ ）",[434,435],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":437,"libraryId":5,"type":320,"typeLabel":321,"stem":438,"options":439,"answer":325,"analysis":33},1270890,"三级建筑桩基可不配构造钢筋。（ ）",[440,441],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":443,"libraryId":5,"type":320,"typeLabel":321,"stem":444,"options":445,"answer":325,"analysis":33},1270891,"地基基础工程施工中采用的工程设计文件，承包合同文件对施工质量验收的要求不得低于建筑地基基础工程施工质量验收规范的要求。（ ）",[446,447],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":449,"libraryId":5,"type":320,"typeLabel":321,"stem":450,"options":451,"answer":325,"analysis":33},1270892,"混凝土钻孔灌注桩钢筋笼吊装完毕，沉渣厚度符合要求后，即可浇注水下混凝土。（ ）",[452,453],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},{"id":455,"libraryId":5,"type":320,"typeLabel":321,"stem":456,"options":457,"answer":325,"analysis":33},1270893,"地下防水工程中，防水等级为I级的工程，其结构内壁并不是没有地下渗水现象。（ ）",[458,459],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":26},[461,464,467,470,473,476],{"id":15,"name":462,"category":7,"favorite":463},"领导干部任职前廉政法规知识测试题",92,{"id":465,"name":466,"category":7,"favorite":15},595,"建筑结构与设备",{"id":468,"name":469,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":471,"name":472,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":474,"name":475,"category":7,"favorite":8},534,"BIM工程师",{"id":477,"name":475,"category":7,"favorite":8},535]