[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-858-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":544},{"id":5,"name":6,"category":7,"favorite":8},858,"(土建质量)专业管理实务 岗位知识","建筑工程",0,23,50,1473,[13,34,46,58,70,82,94,106,118,130,142,154,166,176,188,200,208,220,232,244,252,264,276,288,300,312,324,336,348,360,372,384,396,406,418,426,438,450,462,474,484,490,496,502,508,514,520,526,532,538],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1271799,1,"单选题","下列不属于专职质检员对计量工作的质量控制内容的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工过程中使用的计量仪器、检测设备、称重衡器的质量控制。",false,{"key":24,"text":25,"correct":26},"B","对承包单位作业活动质量的复核与确认。",true,{"key":28,"text":29,"correct":22},"C","从事计量作业人员须具备相应的技术水平，尤其是现场从事施工测量的测量工和从事试验、检验的试验工。",{"key":31,"text":32,"correct":22},"D","现场计量操作的质量控制。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1271800,"在施工缝处继续浇筑混凝土时，已浇筑的混凝土抗压强度不应小于（ ）MPa。",[38,40,42,44],{"key":20,"text":39,"correct":22},"0.8",{"key":24,"text":41,"correct":22},"1.0",{"key":28,"text":43,"correct":26},"1.2",{"key":31,"text":45,"correct":22},"1.4",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1271801,"《建筑装饰装修工程施工质量验收规范》GB50210—2001中，金属门窗框与墙体之间的缝隙应填嵌饱满并采用（ ）密封。",[50,52,54,56],{"key":20,"text":51,"correct":22},"水泥砂浆",{"key":24,"text":53,"correct":22},"细石混凝土",{"key":28,"text":55,"correct":26},"密封胶",{"key":31,"text":57,"correct":22},"腻子粉",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1271802,"领导确立本组织统一的宗旨和方向，并营造和保持员工充分参与实现组织目标的内部环境。因此领导在企业的质量管理中起着决定性的作用，只有领导重视，各项质量活动才能有效开展，是指质量管理的八项原则中（ ）的具体内容。",[62,64,66,68],{"key":20,"text":63,"correct":22},"以顾客为关注焦点",{"key":24,"text":65,"correct":26},"领导作用",{"key":28,"text":67,"correct":22},"全员参与",{"key":31,"text":69,"correct":22},"过程方法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1271803,"下列不属于材料控制要点的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"加强材料的检查验收，严把质量关",{"key":24,"text":77,"correct":22},"抓好材料的现场管理，并做好合理使用",{"key":28,"text":79,"correct":22},"严格按规范、标准的要求组织材料的检验，材料的取样、实验操作均应符合规范要求",{"key":31,"text":81,"correct":26},"加强材料的质量控制，是提高工程质量的重要保证",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1271804,"有些建筑细部尺寸过小无法表达清楚或参照的是标准图集，需要用（ ）表达清楚。",[86,88,90,92],{"key":20,"text":87,"correct":26},"索引符号",{"key":24,"text":89,"correct":22},"详图符号",{"key":28,"text":91,"correct":22},"附加轴线符号",{"key":31,"text":93,"correct":22},"定位轴线符号",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1271805,"质量策划的首要结果是设定（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"质量方案",{"key":24,"text":101,"correct":22},"质量计划",{"key":28,"text":103,"correct":22},"质量方针",{"key":31,"text":105,"correct":26},"质量目标",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1271806,"有关检查的属于有（ ）个。",[110,112,114,116],{"key":20,"text":111,"correct":22},"5",{"key":24,"text":113,"correct":22},"6",{"key":28,"text":115,"correct":26},"7",{"key":31,"text":117,"correct":22},"8",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1271807,"《实施工程建设强制性标准监督规定》所称工程建设强制性标准是指直接涉及工程质量、安全、卫生及环境保护等方面的工程建设标准（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"强制性条文",{"key":24,"text":125,"correct":22},"条款",{"key":28,"text":127,"correct":22},"条文说明",{"key":31,"text":129,"correct":22},"附录",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1271808,"在工程开工前，总监理工程师应组织专业监理工程师审查承包单位报送的施工组织设计（方案）报审表，提出意见，并经总监理工程师审核、签认后报（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"监理单位",{"key":24,"text":137,"correct":26},"建设单位",{"key":28,"text":139,"correct":22},"施工单位",{"key":31,"text":141,"correct":22},"设计单位",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1271809,"按国家标准《普通混凝土力学性能试验方法》GB\u002FT50081—2002，标准混凝土试块为边长是（ ）mm的立方体试件。",[146,148,150,152],{"key":20,"text":147,"correct":22},"200",{"key":24,"text":149,"correct":26},"150",{"key":28,"text":151,"correct":22},"100",{"key":31,"text":153,"correct":22},"70.7",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1271810,"工程事故发生后，首先应查明原因、落实措施、妥善处理、消除隐患、界定责任，其中，最核心、最关键的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"查明原因",{"key":24,"text":161,"correct":22},"妥善处理",{"key":28,"text":163,"correct":22},"消除隐患",{"key":31,"text":165,"correct":22},"界定责任",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1271811,"（ ）是工程质量的主体，开工前各项目部必须建立“横向到边、纵向到底、控制有效”的质量自检体系，严格执行“自检、互检、交接检”的三检制度。",[170,171,172,174],{"key":20,"text":141,"correct":22},{"key":24,"text":135,"correct":22},{"key":28,"text":173,"correct":22},"发包人",{"key":31,"text":175,"correct":26},"承包人",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},1271812,"工程项目经理部是施工承包单位依据承包合同派驻工程施工现场全面履行施工合同的组织机构，（ ）全权代表施工单位履行施工承包合同，对项目经理部全权负责。",[180,182,184,186],{"key":20,"text":181,"correct":22},"公司负责人",{"key":24,"text":183,"correct":22},"项目总工",{"key":28,"text":185,"correct":22},"施工队长",{"key":31,"text":187,"correct":26},"项目经理",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":20,"analysis":33},1271813,"单位（子单位）工程观感质量检查综合评价用（ ）评判。",[192,194,196,198],{"key":20,"text":193,"correct":26},"好、一般、差",{"key":24,"text":195,"correct":22},"优、良、一般、差",{"key":28,"text":197,"correct":22},"A等、B等、C等",{"key":31,"text":199,"correct":22},"I级、II级、III级",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1271814,"混凝土试块强度统计、评定记录应由（ ）填写，城建档案馆、建设单位、施工单位各存一份。",[204,205,206,207],{"key":20,"text":137,"correct":22},{"key":24,"text":141,"correct":22},{"key":28,"text":135,"correct":22},{"key":31,"text":139,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":28,"analysis":33},1271815,"砌体基础包括砖砌体基础、混凝土小型空心砌块砌体基础、石砌体基础及（ ）基础。",[212,214,216,218],{"key":20,"text":213,"correct":22},"素混凝土基础",{"key":24,"text":215,"correct":22},"钢筋混凝土基础",{"key":28,"text":217,"correct":26},"配筋砌体基础",{"key":31,"text":219,"correct":22},"蒸压灰砂砖基础",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":31,"analysis":33},1271816,"混凝土和易性是一项综合的技术性质，下面（ ）不属于和易性范畴之内。",[224,226,228,230],{"key":20,"text":225,"correct":22},"流动性",{"key":24,"text":227,"correct":22},"黏聚性",{"key":28,"text":229,"correct":22},"保水性",{"key":31,"text":231,"correct":26},"安定性",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},1271817,"冷贴法铺贴卷材时，接缝口应用密封材料封严，宽度不应小于（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":22},"5mm",{"key":24,"text":239,"correct":22},"7mm",{"key":28,"text":241,"correct":22},"8mm",{"key":31,"text":243,"correct":26},"10mm",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":28,"analysis":33},1271818,"工程竣工验收前，（ ）应对相应的资料进行核查，核查人填写意见并签字。",[248,249,250,251],{"key":20,"text":137,"correct":22},{"key":24,"text":141,"correct":22},{"key":28,"text":135,"correct":26},{"key":31,"text":139,"correct":22},{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},1271819,"砌体工程施工有①放线、②抄平、③摆砖、④立皮数杆、⑤挂线、⑥砌砖、⑦勾缝、⑧清理，正确顺序为（ ）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"②→③→①→④→⑤→⑥→⑦→⑧",{"key":24,"text":259,"correct":26},"②→①→③→④→⑤→⑥→⑦→⑧",{"key":28,"text":261,"correct":22},"②→③→①→⑤→④→⑥→⑦→⑧",{"key":31,"text":263,"correct":22},"②→①→③→⑤→④→⑥→⑦→⑧",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":28,"analysis":33},1271820,"隐蔽工程施工完毕后，由（ ）填写隐检记录。",[268,270,272,274],{"key":20,"text":269,"correct":22},"项目技术负责人",{"key":24,"text":271,"correct":22},"质量检查员",{"key":28,"text":273,"correct":26},"专业工长",{"key":31,"text":275,"correct":22},"监理",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},1271821,"砂桩地基分项工程属于（ ）子分部工程。",[280,282,284,286],{"key":20,"text":281,"correct":26},"地基处理",{"key":24,"text":283,"correct":22},"桩基",{"key":28,"text":285,"correct":22},"混凝土基础",{"key":31,"text":287,"correct":22},"土方工程",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":31,"analysis":33},1271822,"建筑施工图又简称（ ）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"结施设施电施建施",{"key":24,"text":295,"correct":22},"设施",{"key":28,"text":297,"correct":22},"电施",{"key":31,"text":299,"correct":26},"建施",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":31,"analysis":33},1271823,"施工阶段质量控制的目标是（ ）。",[304,306,308,310],{"key":20,"text":305,"correct":22},"制定质量目标、规定过程和资源，以实现其目的",{"key":24,"text":307,"correct":22},"致力于提供质量要求得到满足的信任",{"key":28,"text":309,"correct":22},"增强满足质量要求的能力",{"key":31,"text":311,"correct":26},"确保工序质量合格杜绝质量事故发生",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1271824,"工程质量事故经过处理后，都应有明确的（ ）结论。",[316,318,320,322],{"key":20,"text":317,"correct":22},"口头",{"key":24,"text":319,"correct":26},"书面",{"key":28,"text":321,"correct":22},"口头或者书面",{"key":31,"text":323,"correct":22},"口头并且书面",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},1271825,"贮存期超过（ ）的过期水泥或受潮、结块的水泥，重新检定其强度等级，并且不允许用于重要工程中。",[328,330,332,334],{"key":20,"text":329,"correct":22},"一年",{"key":24,"text":331,"correct":26},"三个月",{"key":28,"text":333,"correct":22},"半年",{"key":31,"text":335,"correct":22},"两年",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1271826,"某施工单位承建某建设工程项目，该项目建设工期很紧，为了保障工程建设顺利进行，建设单位向施工单位及时提供了原始基准点、基准线和标高测控点资料，施工单位应（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"按照建设单位提供的资料及时开始施工",{"key":24,"text":343,"correct":26},"应做好复核工作，经审核批准后，才能进行后续相关工序的施工",{"key":28,"text":345,"correct":22},"首先进行复核，然后将复核结果报设计单位",{"key":31,"text":347,"correct":22},"首先进行复核，然后将结果报勘察单位审核",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1271827,"由于基础平面图实际上是水平剖面图，故剖到的基础墙、柱的边线用（ ）画出。",[352,354,356,358],{"key":20,"text":353,"correct":26},"粗实线",{"key":24,"text":355,"correct":22},"虚线",{"key":28,"text":357,"correct":22},"细实线",{"key":31,"text":359,"correct":22},"点划线",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1271828,"用于检查结构构件混凝土强度的试件，应在混凝土的（ ）随机抽取。",[364,366,368,370],{"key":20,"text":365,"correct":26},"浇筑地点",{"key":24,"text":367,"correct":22},"搅拌机口",{"key":28,"text":369,"correct":22},"运输车中",{"key":31,"text":371,"correct":22},"计量地点",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},1271829,"施工单位的质量控制目标，是通过施工全过程的（ ）自控，保证交付满足施工合同及设计文件所规定的质量标准的建筑工程产品。",[376,378,380,382],{"key":20,"text":377,"correct":22},"验收签证",{"key":24,"text":379,"correct":26},"全面质量",{"key":28,"text":381,"correct":22},"设计",{"key":31,"text":383,"correct":22},"施工中的问题",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":31,"analysis":33},1271830,"下列（ ）不属于填土工程质量检验标准中的一般项目。",[388,390,392,394],{"key":20,"text":389,"correct":22},"回填土料",{"key":24,"text":391,"correct":22},"分层厚度及含水量",{"key":28,"text":393,"correct":22},"表面平整度",{"key":31,"text":395,"correct":26},"分层压实系数",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":28,"analysis":33},1271831,"施工承包单位做好技术交底，是取得好的施工质量的条件之一。为做好技术交底，项目经理部必须由（ ）编制技术交底书，并经项目总工程师批准。",[400,401,402,404],{"key":20,"text":271,"correct":22},{"key":24,"text":187,"correct":22},{"key":28,"text":403,"correct":26},"主管技术人员",{"key":31,"text":405,"correct":22},"施工员",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},1271832,"对于泵送混凝土施工时应注意事项不正确的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"泵与浇筑地点联络畅通",{"key":24,"text":413,"correct":22},"泵送前应先用水灰比为0.7水泥砂浆湿润管道，同时要避免将水泥砂集中浇筑",{"key":28,"text":415,"correct":26},"泵送过程中可根据坍落度情况适当加水",{"key":31,"text":417,"correct":22},"应配专人巡视管道，发现异常及时处理",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1271833,"建设工程竣工验收备案系指工程竣工验收合格后，依据《房屋建筑工程和市政基础设施工程竣工验收备案管理的规定》，（ ）在指定的期限内，将与工程有关的文件资料送交备案部门查验的过程。",[422,423,424,425],{"key":20,"text":137,"correct":26},{"key":24,"text":135,"correct":22},{"key":28,"text":141,"correct":22},{"key":31,"text":139,"correct":22},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1271834,"施工准备阶段的质量控制，属于（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"事前控制",{"key":24,"text":433,"correct":22},"事中控制",{"key":28,"text":435,"correct":22},"事后控制",{"key":31,"text":437,"correct":22},"实时控制",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1271835,"见证取样的频率，国家或地方主管部门有规定的，执行相关规定；施工承包合同中如有明确规定的，执行施工承包合同的规定。见证取样的频率和数量，包括在承包单位自检范围内，一般所占比例为（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"30%。",{"key":24,"text":445,"correct":22},"50%",{"key":28,"text":447,"correct":22},"10%",{"key":31,"text":449,"correct":22},"20%",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},1271836,"KL2（3 B）：表示（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"框架梁第2号，3跨，单端有悬挑",{"key":24,"text":457,"correct":22},"连系梁第2号，3跨，单端有悬挑",{"key":28,"text":459,"correct":26},"框架梁第2号，3跨，两端有悬挑框支梁第2号，3跨，两端有悬挑",{"key":31,"text":461,"correct":22},"框架梁第2号，3跨，单端有悬挑框支梁第2号，3跨，两端有悬挑",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},1271837,"结构可靠性是指结构在规定的时间内、规定的条件下完成预定功能的能力，包括安全性、适用性和（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"可靠性",{"key":24,"text":469,"correct":22},"长期性",{"key":28,"text":471,"correct":26},"耐久性",{"key":31,"text":473,"correct":22},"牢固性",{"id":475,"libraryId":5,"type":476,"typeLabel":477,"stem":478,"options":479,"answer":483,"analysis":33},1271838,3,"判断题","监理单位干扰因素是影响施工项目进度的因素之一（ ）",[480,482],{"key":20,"text":481,"correct":22},"正确",{"key":24,"text":483,"correct":26},"错误",{"id":485,"libraryId":5,"type":476,"typeLabel":477,"stem":486,"options":487,"answer":483,"analysis":33},1271839,"单位工程质量竣工验收应由总监理工程师组织。",[488,489],{"key":20,"text":481,"correct":22},{"key":24,"text":483,"correct":26},{"id":491,"libraryId":5,"type":476,"typeLabel":477,"stem":492,"options":493,"answer":481,"analysis":33},1271840,"《屋面工程质量验收规范》GB50207—2002中，卷材或涂膜防水层在天沟、檐沟与屋面交接处、泛水、阴阳角等部位，应增加材或涂膜附加层。",[494,495],{"key":20,"text":481,"correct":26},{"key":24,"text":483,"correct":22},{"id":497,"libraryId":5,"type":476,"typeLabel":477,"stem":498,"options":499,"answer":481,"analysis":33},1271841,"施工单位的质量控制目标，是通过施工全过程的全面质量自控，保证交付满足施工合同及设计文件所规定的质量标准的建筑工程产品。（ ）",[500,501],{"key":20,"text":481,"correct":26},{"key":24,"text":483,"correct":22},{"id":503,"libraryId":5,"type":476,"typeLabel":477,"stem":504,"options":505,"answer":481,"analysis":33},1271842,"处理工程质量事故，必须分析原因，做出对的处理决策，这就要以充分的、准确的有关资料作为决策的基础和依据。",[506,507],{"key":20,"text":481,"correct":26},{"key":24,"text":483,"correct":22},{"id":509,"libraryId":5,"type":476,"typeLabel":477,"stem":510,"options":511,"answer":483,"analysis":33},1271843,"广义的工程质量管理，泛指建设全过程的质量管理。其管理的范围贯穿于工程建设的决策、勘察、设计、施工的全过程。一般意义的质量管理，指的是工程设计阶段的管理。",[512,513],{"key":20,"text":481,"correct":22},{"key":24,"text":483,"correct":26},{"id":515,"libraryId":5,"type":476,"typeLabel":477,"stem":516,"options":517,"answer":481,"analysis":33},1271844,"凡涉及施工作业技术活动基准和依据的技术工作，都应该严格进行专人负责的复核性检查，以避免基准失误给整个工程质量带来难以补救的或全局性的危害。",[518,519],{"key":20,"text":481,"correct":26},{"key":24,"text":483,"correct":22},{"id":521,"libraryId":5,"type":476,"typeLabel":477,"stem":522,"options":523,"answer":483,"analysis":33},1271845,"地板、洁具、瓷砖等精装修部分是建筑装饰装修工程隐检主要项目之一。",[524,525],{"key":20,"text":481,"correct":22},{"key":24,"text":483,"correct":26},{"id":527,"libraryId":5,"type":476,"typeLabel":477,"stem":528,"options":529,"answer":483,"analysis":33},1271846,"工程质量三个阶段的控制中，事后控制的重点发现质量缺陷并提出整改方案。（ ）",[530,531],{"key":20,"text":481,"correct":22},{"key":24,"text":483,"correct":26},{"id":533,"libraryId":5,"type":476,"typeLabel":477,"stem":534,"options":535,"answer":483,"analysis":33},1271847,"带肋钢筋套筒挤压连接时，钢筋插入套筒内深度应符合设计要求。钢筋端头离套筒长度中心点不宜超过15mm，先挤压一端钢筋，插入接连钢筋后，再挤压另一端套筒，挤压宜从套筒中部开始，依次向两端挤压，挤压机与钢筋轴线保持垂直。",[536,537],{"key":20,"text":481,"correct":22},{"key":24,"text":483,"correct":26},{"id":539,"libraryId":5,"type":476,"typeLabel":477,"stem":540,"options":541,"answer":483,"analysis":33},1271848,"重大事故，是指造成10人以上30人以下死亡，或者50人以上100人以下重伤，或者6000万元以上1亿元以下直接经济损失的事故。",[542,543],{"key":20,"text":481,"correct":22},{"key":24,"text":483,"correct":26},[545,548,551,554,557,560],{"id":15,"name":546,"category":7,"favorite":547},"领导干部任职前廉政法规知识测试题",92,{"id":549,"name":550,"category":7,"favorite":15},595,"建筑结构与设备",{"id":552,"name":553,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":555,"name":556,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":558,"name":559,"category":7,"favorite":8},534,"BIM工程师",{"id":561,"name":559,"category":7,"favorite":8},535]