[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-858-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},858,"(土建质量)专业管理实务 岗位知识","建筑工程",0,20,50,1473,[13,34,46,58,70,82,94,105,117,129,141,153,165,177,188,200,212,222,234,244,256,268,280,292,304,313,324,336,347,359,371,383,395,407,419,430,442,454,466,477,489,501,513,523,535,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1271649,1,"单选题","建筑工程施工是一个十分复杂的形成建筑实体的过程，也是形成最终产品质量的重要阶段，在施工过程中对工程质量的控制是决定最终产品质量的关键，因此，要提高房屋建筑工程项目的质量，就必须狠抓（ ）的质量管理。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","可行性研究阶段",false,{"key":24,"text":25,"correct":22},"B","设计阶段",{"key":27,"text":28,"correct":29},"C","施工阶段",true,{"key":31,"text":32,"correct":22},"D","竣工验收阶段","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1271650,"下列（ ）不属于土方开挖工程的质量检验的主控项目。",[38,40,42,44],{"key":20,"text":39,"correct":22},"标高",{"key":24,"text":41,"correct":22},"长度、宽度",{"key":27,"text":43,"correct":29},"表面平整度",{"key":31,"text":45,"correct":22},"边坡",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1271651,"钢筋的工艺性能表示钢材在各种加工过程中的行为，包括弯曲性能和（ ）等。",[50,52,54,56],{"key":20,"text":51,"correct":29},"焊接性能",{"key":24,"text":53,"correct":22},"拉伸性能",{"key":27,"text":55,"correct":22},"冲击性能",{"key":31,"text":57,"correct":22},"疲劳性能",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1271652,"施工人员应当树立五大观念，下列不属于五大观念的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"注重环境保护的观念",{"key":24,"text":65,"correct":22},"社会效益、企业效益（质量、成本、工期相结合）综合效益观念",{"key":27,"text":67,"correct":22},"质量第一的观念",{"key":31,"text":69,"correct":22},"预控为主的观念",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1271653,"凡运到施工现场的原材料、半成品或构配件，进场前应由施工承包单位按规定要求进行检验的检验或试验报告，经（ ）审查并确认其质量合格后，方准进场。凡是没有产品出厂合格证明及检验不合格者，不得进场。",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目承包负责人",{"key":24,"text":77,"correct":29},"监理工程师",{"key":27,"text":79,"correct":22},"项目技术负责人",{"key":31,"text":81,"correct":22},"总监理工程师",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1271654,"地下工程防水等级分为四级，其中（ ）级防水要求最高。",[86,88,90,92],{"key":20,"text":87,"correct":29},"1",{"key":24,"text":89,"correct":22},"2",{"key":27,"text":91,"correct":22},"3",{"key":31,"text":93,"correct":22},"4",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1271655,"（ ）是企业法人在工程项目上的代表，是项目工程质量的第一责任人，对工程质量终身负责。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工长",{"key":24,"text":101,"correct":22},"项目质量副经理",{"key":27,"text":103,"correct":29},"项目经理",{"key":31,"text":81,"correct":22},{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},1271656,"防水混凝土终凝后立即进行养护，养护时间不少于（ ），始终保持混凝土表面湿润，顶板、底板尽可能蓄水养护，侧墙应淋水养护，并应遮盖湿土工布，夏天谨防太阳直晒。",[109,111,113,115],{"key":20,"text":110,"correct":22},"28d",{"key":24,"text":112,"correct":29},"14d",{"key":27,"text":114,"correct":22},"30d",{"key":31,"text":116,"correct":22},"60d",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1271657,"《地下防水工程质量验收规范》GB50208一2011中，地下工程防水等级有（ ）级。",[121,123,125,127],{"key":20,"text":122,"correct":22},"二",{"key":24,"text":124,"correct":22},"三",{"key":27,"text":126,"correct":29},"四",{"key":31,"text":128,"correct":22},"五",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":20,"analysis":33},1271658,"质量事故的处理是否达到预期的目的，是否依然存在隐患，应当通过（ ）和验收做出确认。",[133,135,137,139],{"key":20,"text":134,"correct":29},"检查鉴定",{"key":24,"text":136,"correct":22},"现场检查",{"key":27,"text":138,"correct":22},"上级检查",{"key":31,"text":140,"correct":22},"方案论证",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1271659,"下列不属于质量技术管理措施的是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"对于材料的采购、贮存、标识等做出明确的规定，保证不合格材料不得用于工程",{"key":24,"text":148,"correct":22},"施工技术资料管理目标及措施",{"key":27,"text":150,"correct":22},"工程施工难点、重点所采取的技术措施、质量保证措施等",{"key":31,"text":152,"correct":29},"对下列达到一定规模的危险性较大的分部分项工程编制专项安全施工方案，并附安全验算结果",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1271660,"（ ）指的是岩石风化后经雨水冲刷或由岩石轧制而成的粒径为0.15～4.75mm的粒料。",[157,159,161,163],{"key":20,"text":158,"correct":29},"砂",{"key":24,"text":160,"correct":22},"碎石",{"key":27,"text":162,"correct":22},"石灰",{"key":31,"text":164,"correct":22},"水泥",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1271661,"（ ）是用来表明一个工程所在位置的总体布置。",[169,171,173,175],{"key":20,"text":170,"correct":22},"平面图",{"key":24,"text":172,"correct":29},"总平面图",{"key":27,"text":174,"correct":22},"立面图",{"key":31,"text":176,"correct":22},"剖面图",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},1271662,"施工项目质量计划应由（ ）主持编制。",[181,183,185,187],{"key":20,"text":182,"correct":22},"施工工长",{"key":24,"text":184,"correct":22},"技术负责人",{"key":27,"text":186,"correct":22},"质检员",{"key":31,"text":103,"correct":29},{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},1271663,"地基与基础分部工程质量验收的验收单位不包括（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"设计单位",{"key":24,"text":195,"correct":22},"勘察单位",{"key":27,"text":197,"correct":22},"施工单位",{"key":31,"text":199,"correct":29},"政府质量监督机构",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1271664,"平面图中的墙体是由定位轴线和定位尺寸来定位的，其中横向定位轴线是由（ ）组成。",[204,206,208,210],{"key":20,"text":205,"correct":29},"阿拉伯数字按自左向右顺序书写",{"key":24,"text":207,"correct":22},"拉丁字母自左向右顺序书写",{"key":27,"text":209,"correct":22},"阿拉伯数字自下向上顺序书写",{"key":31,"text":211,"correct":22},"拉丁字母自下向上顺序书写",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1271665,"施工单位的工程质量验收记录应由（ ）填写。",[216,217,219,221],{"key":20,"text":103,"correct":22},{"key":24,"text":218,"correct":29},"工程质量检查员",{"key":27,"text":220,"correct":22},"资料员",{"key":31,"text":184,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},1271666,"以下哪项内容不是施工准备阶段质量控制的内容（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"设计交底和图纸会审",{"key":24,"text":229,"correct":22},"（质量计划）的审查",{"key":27,"text":231,"correct":22},"施工施工组织设计生产要素配置质量审查",{"key":31,"text":233,"correct":29},"隐蔽工程质量控制",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},1271667,"下面（ ）不能作为建筑砂浆的胶凝材料。",[238,239,240,242],{"key":20,"text":164,"correct":22},{"key":24,"text":162,"correct":22},{"key":27,"text":241,"correct":22},"石膏",{"key":31,"text":243,"correct":29},"砂子",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":24,"analysis":33},1271668,"砌筑砂浆必须搅拌均匀，一般情况下砂浆应在（ ）h内用完，气温超过30℃时，必须在2—3h内用完。",[248,250,252,254],{"key":20,"text":249,"correct":22},"1~2",{"key":24,"text":251,"correct":29},"3~4",{"key":27,"text":253,"correct":22},"4~5",{"key":31,"text":255,"correct":22},"5~6",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},1271669,"厨、卫间周边翻边混凝土应整体浇筑，高度（ ）mm，砼强度等级（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"≥200，≥C30",{"key":24,"text":263,"correct":22},"≥300，≥C20",{"key":27,"text":265,"correct":29},"≥200，≥C20",{"key":31,"text":267,"correct":22},"≥300，≥C30",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},1271670,"以下不是水泥土搅拌桩地基的施工质量控制点的是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"水泥及外加剂质量",{"key":24,"text":275,"correct":22},"水泥用量",{"key":27,"text":277,"correct":22},"桩体强度",{"key":31,"text":279,"correct":29},"顶面平整度",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},1271671,"以下是隐检项目的是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":29},"检查钢筋笼规格",{"key":24,"text":287,"correct":22},"检查楼板厚度",{"key":27,"text":289,"correct":22},"检查地面的平整度",{"key":31,"text":291,"correct":22},"检查混凝土强度",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1271672,"《生产安全事故报告和调查处理条例》（国务院令第493号）中规定：（ ），是指造成3人以上10人以下死亡，或者10人以上50人以下重伤，或者1000万元以上5000万元以下直接经济损失的事故。",[296,298,300,302],{"key":20,"text":297,"correct":22},"重大事故",{"key":24,"text":299,"correct":29},"较大事故",{"key":27,"text":301,"correct":22},"一般事故",{"key":31,"text":303,"correct":22},"特别重大事故",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1271673,"材料员、机械员对进场的材料、构件、机械设备进行质量验收或退货、索赔，有特殊要求的物资、构件、机械设备执行（ ）的指令。",[308,310,311,312],{"key":20,"text":309,"correct":29},"质量副经理",{"key":24,"text":103,"correct":22},{"key":27,"text":77,"correct":22},{"key":31,"text":186,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":31,"analysis":33},1271674,"下列不属于安全施工技术措施的是（ ）。",[317,318,320,322],{"key":20,"text":152,"correct":22},{"key":24,"text":319,"correct":22},"预防自然灾害的措施",{"key":27,"text":321,"correct":22},"防灾防爆及消防措施",{"key":31,"text":323,"correct":29},"冬期室内装修工程施工封闭、供热、采暖措施及有关质量、安全消防措施等",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":27,"analysis":33},1271675,"（ ）是指各类影响工程结构、使用功能和外形观感的常见性质量损伤，犹如“多发病”一样。",[328,330,332,334],{"key":20,"text":329,"correct":22},"工程质量缺陷",{"key":24,"text":331,"correct":22},"工程质量事故",{"key":27,"text":333,"correct":29},"工程质量通病",{"key":31,"text":335,"correct":22},"工程安全事故",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1271676,"为了保证工程能够顺利地施工，（ ）督促分包单位按照合同事先划定的范围，占有和使用现场有关部分。",[340,342,344,345],{"key":20,"text":341,"correct":22},"技术员",{"key":24,"text":343,"correct":29},"质量检查员",{"key":27,"text":103,"correct":22},{"key":31,"text":346,"correct":22},"监理",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":31,"analysis":33},1271677,"以下不是质量检查员参加设计技术交底会应了解的基本内容的是（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":22},"对主要建筑材料、构配件和设备的要求，所采用的新技术、新工艺、新材料、新设备的要求，以及施工中应特别注意的事项等",{"key":24,"text":354,"correct":22},"对建设单位、承包单位和监理单位提出的对施工图的意见和建议的答复",{"key":27,"text":356,"correct":22},"设计主导思想、建筑艺术构思和要求、采用的设计规范、确定的抗震等级、防火等级，基础、结构、内外装修及机电设备设计（设备造型）等",{"key":31,"text":358,"correct":29},"在设计交底会上确认的设计变更上会签",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1271678,"质量管理的首要任务是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":29},"确定质量方针、目标和职责",{"key":24,"text":366,"correct":22},"建立有效的质量管理体系",{"key":27,"text":368,"correct":22},"质量策划、质量控制、质量保证和质量改进",{"key":31,"text":370,"correct":22},"确保质量方针、目标的实施和实现",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":31,"analysis":33},1271679,"在施工质量处理过程中，按照施工验收规范和相关的质量标准，并结合实际量测、试验和检测等方法，评价质量事故的处理是否达到预期目的，是否依然存在隐患属于（ ）",[375,377,379,381],{"key":20,"text":376,"correct":22},"制订事故处理方案",{"key":24,"text":378,"correct":22},"事故处理",{"key":27,"text":380,"correct":22},"事故原因分析",{"key":31,"text":382,"correct":29},"事故处理的鉴定验收",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},1271680,"基槽开挖后，下列（ ）不属于应检验的内容。",[387,389,391,393],{"key":20,"text":388,"correct":22},"基坑的位置",{"key":24,"text":390,"correct":29},"基础尺寸",{"key":27,"text":392,"correct":22},"坑底标高",{"key":31,"text":394,"correct":22},"基坑土质",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1271681,"（ ）不属于分项工程施工工艺方案中技术措施。",[399,401,403,405],{"key":20,"text":400,"correct":22},"施工准备",{"key":24,"text":402,"correct":22},"操作工艺",{"key":27,"text":404,"correct":22},"质量标准",{"key":31,"text":406,"correct":29},"施工段划分",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1271682,"某工程在混凝土施工过程中，由于称重设备发生故障，导致工人向混凝土中掺入超量聚羧酸盐系高效减水剂，导致质量事故。该事故应判定为（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":22},"指导责任事故",{"key":24,"text":414,"correct":22},"社会、经济原因引发的事故",{"key":27,"text":416,"correct":22},"技术原因引发的事故",{"key":31,"text":418,"correct":29},"管理原因引发的事故",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":20,"analysis":33},1271683,"由于工程负责人片面追求施工进度，放松或不按质量标准进行控制和检验，人为降低施工质量标准。这个属于（ ）。",[423,424,426,428],{"key":20,"text":412,"correct":29},{"key":24,"text":425,"correct":22},"操作责任事故",{"key":27,"text":427,"correct":22},"安全责任事故",{"key":31,"text":429,"correct":22},"设计责任事故",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},1271684,"如果采用机械开挖，要配合一定程度的人工清土，机械开挖到接近槽底时，用水准仪控制标高，预留（ ）cm土层进行人工开挖，以防止超挖。",[434,436,438,440],{"key":20,"text":435,"correct":22},"10～20",{"key":24,"text":437,"correct":22},"30～40",{"key":27,"text":439,"correct":22},"10～30",{"key":31,"text":441,"correct":29},"20～30",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1271685,"涂膜防水屋面主要包括找平层、涂膜防水层、细部构造及（ ）四个分项工程。",[446,448,450,452],{"key":20,"text":447,"correct":22},"隔热层",{"key":24,"text":449,"correct":29},"保温层",{"key":27,"text":451,"correct":22},"架空屋面",{"key":31,"text":453,"correct":22},"屋面排水",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},1271686,"平面图一般常用（ ）比例绘制。",[458,460,462,464],{"key":20,"text":459,"correct":22},"1：1000",{"key":24,"text":461,"correct":22},"1:500",{"key":27,"text":463,"correct":29},"1:100",{"key":31,"text":465,"correct":22},"1:20",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1271687,"单位（子单位）工程质量竣工验收记录由施工单位填写，验收结论由监理（建设）单位填写。综合验收结论由参加验收各方共同商定，（ ）填写，应对工程质量是否符合设计和规范要求及总体质量水平做出评价。",[470,471,473,475],{"key":20,"text":199,"correct":22},{"key":24,"text":472,"correct":29},"建设单位",{"key":27,"text":474,"correct":22},"施工单位专业质量检查员",{"key":31,"text":476,"correct":22},"监理单位专业监理员",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},1271688,"建筑照明通电试运行是属于（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"分部工程",{"key":24,"text":484,"correct":22},"子分部工程",{"key":27,"text":486,"correct":29},"分项工程",{"key":31,"text":488,"correct":22},"检验批",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":31,"analysis":33},1271689,"（ ）是最基本的控制，它决定了有关检验批的质量。",[493,495,497,499],{"key":20,"text":494,"correct":22},"施工准备质量控制",{"key":24,"text":496,"correct":22},"施工阶段质量控制",{"key":27,"text":498,"correct":22},"竣工验收质量控制",{"key":31,"text":500,"correct":29},"施工作业过程的质量控制",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1271690,"G4Φ12，表示梁的两个侧面共配置（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"4根Φ12箍筋",{"key":24,"text":508,"correct":29},"4Φ12的纵向构造钢筋，每侧各2Φ12",{"key":27,"text":510,"correct":22},"4根Φ12受力筋",{"key":31,"text":512,"correct":22},"4根Φ12通长筋",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1271691,"施工单位在对进场材料、试块、试件、钢筋接头等实施见证取样是指在（ ）现场监督下，承包单位按相关规范的要求，完成材料、试块、试件等的取样过程。",[517,518,520,521],{"key":20,"text":77,"correct":29},{"key":24,"text":519,"correct":22},"设计人员",{"key":27,"text":103,"correct":22},{"key":31,"text":522,"correct":22},"检测机构",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},1271692,"（ ）主要是针对每一个单位工程（或单项工程、工程项目），编制专门规定的质量措施、资源和活动顺序等的文件。",[527,529,531,533],{"key":20,"text":528,"correct":22},"专项施工方案",{"key":24,"text":530,"correct":22},"施工方案",{"key":27,"text":532,"correct":29},"施工组织设计",{"key":31,"text":534,"correct":22},"进度计划",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},1271693,"施工质量管理环境主要指：施工承包单位的质量管理体系和质量控制（ ）是否处于良好状态。",[539,541,543,545],{"key":20,"text":540,"correct":22},"质检系统",{"key":24,"text":542,"correct":22},"交接检系统",{"key":27,"text":544,"correct":22},"互检系统",{"key":31,"text":546,"correct":29},"自检系统",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},1271694,"下列不属于质量计划编制原则的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"施工项目质量计划应由项目经理主持编制",{"key":24,"text":554,"correct":22},"施工项目质量计划应体现施工项目从分项工程、分部工程到单位工程的过程控制，同时也要体现从资源投入到完成工程质量最终检验和试验的全过程",{"key":27,"text":556,"correct":29},"施工项目质量计划应以质量保证模式标准为基础，把工程项目作为一个系统",{"key":31,"text":558,"correct":22},"施工项目质量计划作为对外质量保证和对内质量控制的依据文件",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1271695,"下列关于土方开挖过程中的质量控制措施表述错误的是（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"土方开挖时，要注意保护标准定位桩、轴线桩、标准工程桩",{"key":24,"text":566,"correct":29},"如果采用机械开挖，不需要配合人工清土，由机械直接运走，节省时间",{"key":27,"text":568,"correct":22},"基坑（槽）挖深要注意减少对基土的扰动",{"key":31,"text":570,"correct":22},"雨期、冬期施工的注意事项",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},1271696,"接地、绝缘电阻测试记录是（ ）项目的资料名称。",[575,577,579,581],{"key":20,"text":576,"correct":22},"建筑与结构",{"key":24,"text":578,"correct":29},"建筑电气",{"key":27,"text":580,"correct":22},"给排水与采暖",{"key":31,"text":582,"correct":22},"通风与空调",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},1271697,"检测鉴定必须委托政府批准的（ ）的法定检测单位进行。",[587,589,591,593],{"key":20,"text":588,"correct":29},"有资质",{"key":24,"text":590,"correct":22},"有专业设备",{"key":27,"text":592,"correct":22},"有专业人员",{"key":31,"text":594,"correct":22},"有固定场所",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":20,"analysis":33},1271698,"建筑工程质量事故发生后，事故的处理的基本要求是：查明原因，落实措施，妥善处理，消除隐患，界定责任，其中核心及关键是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":29},"查明原因",{"key":24,"text":602,"correct":22},"妥善处理",{"key":27,"text":604,"correct":22},"界定责任",{"key":31,"text":606,"correct":22},"落实措施",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]