[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272148":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1272148,858,2,"多选题","预制桩工程质量控制施工质量控制点有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","桩体质量",true,{"key":16,"text":17,"correct":18},"B","地质条件",false,{"key":20,"text":21,"correct":14},"C","承载力",{"key":23,"text":24,"correct":14},"D","桩顶标高",{"key":26,"text":27,"correct":14},"E","停锤标准","ACDE","预制桩工程质量控制施工质量控制点有①桩体质量②桩位偏差③承载力④桩顶标高⑤停锤标准。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]