[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272140":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1272140,858,2,"多选题","（ ）需要坚持全过程的质量控制。（容易）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","执行质量三级检验制度",true,{"key":16,"text":17,"correct":14},"B","技术支持",{"key":19,"text":20,"correct":21},"C","施工人员培训",false,{"key":23,"text":24,"correct":14},"D","开展班前活动",{"key":26,"text":27,"correct":14},"E","质量技术交底","ABDE","坚持全过程的质量控制：制定施工方法、技术支持、开展班前活动、质量技术交底、开展班前活动、执行质量三级检验制度、定期和不定期监督检查。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]