[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272112":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1272112,858,2,"多选题","总平面图中新建建筑物的定位一般采用（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","建筑物标高定位",false,{"key":16,"text":17,"correct":14},"B","场地标高定位",{"key":19,"text":20,"correct":21},"C","原有建筑物或原有道路定位",true,{"key":23,"text":24,"correct":21},"D","按坐标定位",{"key":26,"text":27,"correct":14},"E","按建筑物总长总宽尺寸定位","CD","总平面图中新建建筑物的定位一般采用两种方法，一是按原有建筑物或原有道路定位；二是按坐标定位，采用坐标定位又分为采用测量坐标定位（X、Y表示）和建筑坐标定位（A、B表示）两种。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]