[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272088":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1272088,858,2,"多选题","抹灰工程应进行隐蔽验收的工程项目：（1）总厚度大于或等于（ ）时的（ ），（ ）基体交接处的加强措施。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","35mm",true,{"key":16,"text":17,"correct":18},"B","45mm",false,{"key":20,"text":21,"correct":18},"C","50mm",{"key":23,"text":24,"correct":14},"D","加强措施",{"key":26,"text":27,"correct":14},"E","不同材料","ADE","抹灰工程应对下列隐蔽工程项目进行验收：1抹灰总厚度大于或等于35mm时的加强措施。2不同材料基体交接处的加强措施。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]