[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1272071":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1272071,858,2,"多选题","门窗工程应对（ ）进行隐蔽验收。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","预埋件",true,{"key":16,"text":17,"correct":14},"B","锚固件",{"key":19,"text":20,"correct":14},"C","防腐",{"key":22,"text":23,"correct":14},"D","填嵌处理",{"key":25,"text":26,"correct":27},"E","拼接处",false,"ABCD","门窗工程隐蔽验收的部位：1.预埋件和锚固件2.隐蔽部位的防腐、填嵌处理",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]