[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271965":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1271965,858,2,"多选题","钢筋进场时，应按国家现行相关标准的规定抽取试件作（ ）检验，检验结果必须符合有关标准的规定。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","力学性能",true,{"key":16,"text":17,"correct":14},"B","重量偏差",{"key":19,"text":20,"correct":21},"C","直径",false,{"key":23,"text":24,"correct":21},"D","机械性能",{"key":26,"text":27,"correct":21},"E","化学分析","AB","钢筋进场时，应按国家现行相关标准的规定抽取试件作力学性能检验，重量偏差检验结果必须符合有关标准的规定。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]