[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271927":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1271927,858,2,"多选题","大体积防水混凝土的施工应采取材料选择、温度控制、保温保湿等技术措施。在设计许可的情况下，掺粉煤灰混凝土设计强度的龄期宜为（ ）d或（ ）d。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","28",false,{"key":16,"text":17,"correct":14},"B","42",{"key":19,"text":20,"correct":21},"C","60",true,{"key":23,"text":24,"correct":21},"D","90",{"key":26,"text":27,"correct":14},"E","100","CD","大体积防水混凝土的施工应采取材料选择、温度控制、保温保湿等技术措施。在设计许可的情况下，掺粉煤灰混凝土设计强度的龄期宜为60d或90d。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]