[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271920":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1271920,858,2,"多选题","静压桩质量验收的主控项目为（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","桩体质量检验",true,{"key":16,"text":17,"correct":14},"B","桩位偏差",{"key":19,"text":20,"correct":14},"C","承载力",{"key":22,"text":23,"correct":24},"D","桩顶标高",false,{"key":26,"text":27,"correct":24},"E","桩的静压时间","ABC","静压桩质量验收的主控项目为桩体质量检验，桩位偏差，承载力；一般项目包括成品桩质量，接桩，硫磺胶泥质量，电焊条质量，压桩设计，上下接面偏差，节点弯曲矢高，桩顶标高",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]