[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271917":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1271917,858,2,"多选题","采用硫黄胶泥接桩时，应做到（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","胶泥浇注时间&lt;2min",true,{"key":16,"text":17,"correct":18},"B","胶泥浇注时间&lt;4min",false,{"key":20,"text":21,"correct":14},"C","浇注后停歇时间>7min",{"key":23,"text":24,"correct":18},"D","浇注后停歇时间>20min",{"key":26,"text":27,"correct":18},"E","胶泥要有一定的延性","AC","电焊接桩；焊缝质量。按钢桩电焊接桩焊缝检查。焊后停歇时间＞1min。采用硫黄胶泥接桩时，质量要求应做到胶泥浇注时间7min秒表检查。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]