[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271913":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1271913,858,2,"多选题","注浆地基的主控项目为原材料检验和（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","注浆体强度",true,{"key":16,"text":17,"correct":14},"B","地基承载力",{"key":19,"text":20,"correct":21},"C","注浆压力",false,{"key":23,"text":24,"correct":21},"D","注浆孔深",{"key":26,"text":27,"correct":21},"E","浆体的密度","AB","注浆地基的主控项目原有材料检验和注浆体强度，地基承载力；一般项目是检查数量",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]