[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271851":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1271851,858,2,"多选题","混凝土模板支撑系统中，（ ）属于高大模板，应编制专项施工方案并专家论证。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","搭设高度8m及以上",true,{"key":16,"text":17,"correct":14},"B","搭设跨度18m及以上",{"key":19,"text":20,"correct":21},"C","施工总荷载20kN\u002F㎡及以上",false,{"key":23,"text":24,"correct":21},"D","集中线荷载15kN\u002Fm及以上",{"key":26,"text":27,"correct":14},"E","集中线荷载20kN\u002Fm及以上","ABE","混凝土模板支撑系统中，搭设高度8m及以上；搭设跨度18m及以上，施工总荷载15kN\u002F㎡及以上；集中线荷载20kN\u002Fm及以上属于高大模板，应编制专项施工方案并专家论证。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)专业管理实务 岗位知识","建筑工程",0]