[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271838":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1271838,858,3,"判断题","监理单位干扰因素是影响施工项目进度的因素之一（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"影响施工进度的因素很多，归纳起来有以下几点：工程建设相关单位的影响、物资供应进度的影响、资金的影响、设计变更的影响、施工条件的影响、各种风险因素的影响、承包单位自身管理水平的影响",{"id":6,"name":21,"category":22,"favorite":23},"(土建质量)专业管理实务 岗位知识","建筑工程",0]