[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271792":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1271792,858,1,"单选题","（ ）是本工程实施的最高负责人，对工程符合设计、验收规范、标准要求负责；对各阶段、各工号按期交工负责。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总监理工程师",false,{"key":16,"text":17,"correct":18},"B","项目经理",true,{"key":20,"text":21,"correct":14},"C","总设计师",{"key":23,"text":24,"correct":14},"D","承包单位负责人","项目经理是本工程实施的最高负责人，对工程符合设计、验收规范、标准要求负责；对各阶段、各工号按期交工负责。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]