[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271763":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1271763,858,3,"判断题","施工项目质量计划应体现施工项目从分项工程、分部工程到单位工程的过程控制，同时也要体现从资源投入到完成工程质量最终检验和试验的全过程控制。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(土建质量)专业管理实务 岗位知识","建筑工程",0]