[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271750":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1271750,858,1,"单选题","地基基础分项工程检验批验收时，一般项目应有（ ）合格。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","100%",false,{"key":16,"text":17,"correct":14},"B","90%及以上",{"key":19,"text":20,"correct":14},"C","85%及以上",{"key":22,"text":23,"correct":24},"D","80%及以上",true,"主控项目必须符合验收标准规定，发现问题应立即处理直至符合要求，一般项目应有80%合格。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]