[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271731":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1271731,858,1,"单选题","隐蔽工程验收后由（ ）签署审核意见，并下审核结论。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","监理单位",true,{"key":16,"text":17,"correct":18},"B","施工单位",false,{"key":20,"text":21,"correct":18},"C","设计单位",{"key":23,"text":24,"correct":18},"D","鉴定检测单位","隐蔽工程验收后由监理单位签署审核意见，并下审核结论。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]