[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271727":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1271727,858,1,"单选题","施工单位的项目施工质量计划或施工组织设计文件编成后，应按照工程施工管理程序进行审批，包括（ ）的审批和项目监理机构的审查。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工企业内部",true,{"key":16,"text":17,"correct":18},"B","施工企业外部",false,{"key":20,"text":21,"correct":18},"C","发包人",{"key":23,"text":24,"correct":18},"D","项目部","施工单位的项目施工质量计划或施工组织设计文件编成后，应按照工程施工管理程序进行审批，包括施工企业内部的审批和项目监理机构的审查。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]