[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271680":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1271680,858,1,"单选题","基槽开挖后，下列（ ）不属于应检验的内容。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","基坑的位置",false,{"key":16,"text":17,"correct":18},"B","基础尺寸",true,{"key":20,"text":21,"correct":14},"C","坑底标高",{"key":23,"text":24,"correct":14},"D","基坑土质","不应该是基础尺寸，而应该是基坑平面尺寸，这一道关于基坑的题目。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]