[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271558":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1271558,858,1,"单选题","下面哪一项不属于土方开挖的施工技术（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","土方工程施工前.应该对降水.排水措施进行设计.系统应经检查和试运转.一切正常时方可开始施工",false,{"key":16,"text":17,"correct":14},"B","无支护土方工程采用放坡挖土.有支护土方工程可采用中心岛式（也称墩式）挖土.盆式挖土和逆作法挖土等方法",{"key":19,"text":20,"correct":14},"C","基坑周围地面应该进行防水.排水处理.严防雨水等地面水浸入基坑周边土体",{"key":22,"text":23,"correct":24},"D","清除基底上的垃圾.草皮.树根.杂物.排除坑穴中积水.淤泥和种植土.将基底充分夯实和碾压密实",true,"D选项的内容属于土方回填的内容，其余三项均为土方开挖的内容。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]